View Single Post
Old 06-07-2011, 12:12 PM   #23
SIKSUKR
Senior Member
 
SIKSUKR's Avatar
 
Join Date: Apr 2004
Posts: 5,075
Thanks: 215
Thanked 903 Times in 509 Posts
Default

Quote:
Originally Posted by Belmont Resident View Post
The gap between the joists was greater than I wanted so I took 2x4 PT and laid them down flat and nailed them on top of the existing joists. This decreased the gap without replacing all the joists and made for a much more stable surface to install the decking on.
That won't work in my application. My deck surrounds my pool and I built it flush with the top of the pool and want to keep it that way.
__________________
SIKSUKR
SIKSUKR is offline   Reply With Quote