Quote:
Originally Posted by Belmont Resident
The gap between the joists was greater than I wanted so I took 2x4 PT and laid them down flat and nailed them on top of the existing joists. This decreased the gap without replacing all the joists and made for a much more stable surface to install the decking on.
|
That won't work in my application. My deck surrounds my pool and I built it flush with the top of the pool and want to keep it that way.