Quote:
Originally Posted by chipj29
About 2' or so. You don't even have to remove the drain plunger thingy. Just push it into the drain as far down as it can go. It should get down to the p-trap.
|
I was actually looking to use it for a different application at work.I have some condensate drain lines on my ac air handlers that can be up to 4 ft long with a few 90 degree elbows that clog now and then.