Quote:
Originally Posted by fatlazyless
Probably cannot blame an architect because it looks like the construction is pre-fab or modular which gets put together like giant lego blocks as opposed to individual pieces of lumber?
Could be that out of the $1,015,000 of assessed value (post #28), that perhaps 60-70% of that value was determined to be in the 1 acre of land with 300' of waterfront and not the two structures?
|
It is a prefabbed modular dropped on site. I have heard the floor plan is very odd...