Quote:
Originally Posted by RLW
I'm trying to find the rule that is written pertaining to this, but the last time that I wanted to add sand to the beach I had to jump through hoops to do it. At that time it was a max of 6 yards and then it could only be done every 3 years at a cost of $50 for each permit which one had to supply a topography map of your area, certified notification to both next door lot owners and a picture of the area that it was going to be put into. I have a copy of all the paperwork some place and when I locate it I will post the areas that I'm incorrect if any.
|
That's what I remember too!