View Single Post
Old 08-28-2005, 08:09 PM   #2
codeman671
Senior Member
 
codeman671's Avatar
 
Join Date: Jan 2005
Posts: 3,509
Thanks: 221
Thanked 818 Times in 491 Posts
Default

When ours was built the actual structure was completely done by hand, no equipment at all. They used a barge to crane the material onto shore and everything was moved by hand from that point. The sitework would be the problem though, how do you do a septic system without heavy equipment? Thats a lot of digging by hand...
codeman671 is offline   Reply With Quote