Originally Posted by fatlazyless View Post
Believe that the town says the 4-mile long Meredith Neck Rd is owned by the state, and the state says it is owned by the town. Last Thursday or so, I asked one of the NH-DOT guys who was controlling traffic with a flashing stop sign there at the relatively new horse farm what was up with the road, and he said that the town owns the road, but the NH-DOT does the maintenance repairs in the summer, while the town removes the snow. He said the road is going to get a shim coat, whatever a shim coat is? ...... I had to move along due to other cars coming up behind me..... so I didn't get time to ask him 'what's a shim coat?'

There's a website somewhere .....maybe the NH-DOT ..... that says that the un-numbered state roads like the Meredith Neck Rd ...... are destined to become local town roads .... and the NH-DOT will pay 2/3 paving cost.....if the local town pays 1/3 paving cost .....and thereafter, it is entirely the responsibility of the town; paving, maintenance, and snow removal.

Considering that the Meredith Neck Rd is a four mile long road that is entirely within the one Town of Meredith, and it accesses about 50% of the taxable property in the town, it definitely should become a local town owned road that is entirely the responsibility of the town. Meredith should be a responsible town and pursue the NH-DOTs standing offer of the 2/3 state, 1/3 town pavement redo.

I believe a shim coat is a patch pavement job where the worst road pavement areas get 3/4" asphalt skim coated with a tar patch topping sort like a spackle coat, while the Barnard Ridge Rd got the old pavement scarfed or ground up, and replaced with a new asphalt overlay.

Barnard Ridge Rd, a one mile long road, was on the list of roads to be done by the state for 2015. I do not know if the state paid for it entirely, or if it was split 2/3-state, 1/3-town, with the town being totally responsible in the future?

So's, it seems the four mile long Meredith Neck Rd will get a 3/4" shim coat, which is not as thorough a redo as a scarf-grind up and overlay asphalt paving which is what was done on one mile long, Barnard Ridge Rd.
New Hampshire political crap at its best (or worse). What a waste of tax payer money and many of these tax payers have no voice in the process. Sad, sad situation.

R2B
Resident 2B is offline   Reply With Quote
The Following User Says Thank You to Resident 2B For This Useful Post: