09-21-2015, 11:29 PM
|
#6
|
|
Senior Member
Join Date: Apr 2004
Location: North Shore, MA
Posts: 1,358
Thanks: 998
Thanked 314 Times in 164 Posts
|
Quote:
Originally Posted by fatlazyless
Believe that the town says the 4-mile long Meredith Neck Rd is owned by the state, and the state says it is owned by the town. Last Thursday or so, I asked one of the NH-DOT guys who was controlling traffic with a flashing stop sign there at the relatively new horse farm what was up with the road, and he said that the town owns the road, but the NH-DOT does the maintenance repairs in the summer, while the town removes the snow. He said the road is going to get a shim coat, whatever a shim coat is? ...... I had to move along due to other cars coming up behind me..... so I didn't get time to ask him 'what's a shim coat?'
There's a website somewhere .....maybe the NH-DOT ..... that says that the un-numbered state roads like the Meredith Neck Rd ...... are destined to become local town roads .... and the NH-DOT will pay 2/3 paving cost.....if the local town pays 1/3 paving cost .....and thereafter, it is entirely the responsibility of the town; paving, maintenance, and snow removal.
Considering that the Meredith Neck Rd is a four mile long road that is entirely within the one Town of Meredith, and it accesses about 50% of the taxable property in the town, it definitely should become a local town owned road that is entirely the responsibility of the town. Meredith should be a responsible town and pursue the NH-DOTs standing offer of the 2/3 state, 1/3 town pavement redo.
I believe a shim coat is a patch pavement job where the worst road pavement areas get 3/4" asphalt skim coated with a tar patch topping sort like a spackle coat, while the Barnard Ridge Rd got the old pavement scarfed or ground up, and replaced with a new asphalt overlay.
Barnard Ridge Rd, a one mile long road, was on the list of roads to be done by the state for 2015. I do not know if the state paid for it entirely, or if it was split 2/3-state, 1/3-town, with the town being totally responsible in the future?
So's, it seems the four mile long Meredith Neck Rd will get a 3/4" shim coat, which is not as thorough a redo as a scarf-grind up and overlay asphalt paving which is what was done on one mile long, Barnard Ridge Rd.
|
New Hampshire political crap at its best (or worse). What a waste of tax payer money and many of these tax payers have no voice in the process. Sad, sad situation.
R2B
|
|
|