The NEW Portsmouth, RI (now privately owned) wind turbine started running on Tuesday. This direct drive turbine is supposed to be 1.5 MW. The fan disc is distinctly smaller than the original 1.5 MW geared turbine. I'm thinking this new turbine may be "Downrated" ...maybe to 1.0 MW. Let the SCAM continue

The best part...every minute the turbine runs...The town will pay 15.5 cents/Kw for the power......going into the Grid...weather the town needs the power or not. Local rates are about 10 cents/Kw. NB