05-18-2017, 12:32 PM
|
#45
|
Senior Member
Join Date: Jul 2014
Posts: 6,432
Thanks: 1,181
Thanked 2,136 Times in 1,324 Posts
|
Quote:
Originally Posted by shore things
Docking facility repairs, including breakwaters, that result in no change in the size, location, or configuration of the structures qualify as minimum impact projects. The filing fee for a minimum impact project is $200.
|
Thanks for the info!
Sent from my XT1528 using Tapatalk
|
|
|