05-18-2017, 12:32 PM
|
#47
|
|
Senior Member
Join Date: Jul 2014
Posts: 6,560
Thanks: 1,184
Thanked 2,181 Times in 1,356 Posts
|
Quote:
Originally Posted by shore things
Docking facility repairs, including breakwaters, that result in no change in the size, location, or configuration of the structures qualify as minimum impact projects. The filing fee for a minimum impact project is $200.
|
Thanks for the info!
Sent from my XT1528 using Tapatalk
|
|
|