View Single Post
Old 03-03-2018, 08:49 PM   #3
Descant
Senior Member
 
Join Date: Mar 2006
Location: Merrimack and Welch Island
Posts: 4,413
Thanks: 1,366
Thanked 1,636 Times in 1,068 Posts
Default

Where are you? Having to move a barge long distance may not be something the operator wants to do. You may not want to pay for that.
I think it may be more a matter oi "when can they do the work?" Most operators have a big spring backlog. I'd call whoever did the original installation, if known.

We used to have a couple of pilings at the end of our breakwater/docks and had to reset them often. Finally pulled them out and went without. No problem ever since.
Descant is offline   Reply With Quote