Thread: seasonal dock
View Single Post
Old 05-03-2006, 10:16 PM   #2
Lakegeezer
Senior Member
 
Join Date: Feb 2003
Location: Moultonboro, NH
Posts: 1,679
Blog Entries: 1
Thanks: 354
Thanked 640 Times in 291 Posts
Default Center Harbor Dock and Pier

Check with John Ferranti at CHD&P. He did a good job for us, including design, getting the permits and construction. It ain't cheap, but it eliminated the spring "joy" of standing in the 39 degree water for three hours installing the dock.
__________________
-lg
Lakegeezer is offline   Reply With Quote