Quote:
Originally Posted by SAMIAM
I have a 25X4’ concrete walkway going to my dock. It is cracked and crumbling so I want a PT walk right on top of the old one.
Wondering if I can escape the permit police since it is coving an existing walk and nothing would be touching the water
|
Shouldn't be an issue with NHDES. See Env-Wq 1406.04, (c) (4) on page 15
https://www.des.nh.gov/sites/g/files...nv-wq-1400.pdf