There are a # of logistal and enginnering issues that would have to be solved before this path can be utilized. Southdown is one issue, a 5' fence thats ridicolous; safety issues too and what of "shoreline protection act", a paved road next to the lake within 10-20' feet at points. This makes it more unpleasant looking. As another post put it what about;

Maiden Lady Cove?
Pickeral Cove & Moulton's Cove?

The land to be "used" on the above resides on a "narrow" causeway. Current standards for railroad tracks in the USA are 4' 8" for standard guage track (train track). There is only about 1 or 2 feet clearance on each side of the causeway which is about 200-300+ yards long. Where is this trail supposed to go now? Spends millions to widen the causeway and dredge the lake in that area. What is to be down with the widely used boat tunnel at Pickeral Cove, enlarge that at considerable expense? Beefing up the causeway would cost millions. I don not live in the above coves just go by them in my boat.

Logically for the trail to work in the above areas private property would have to be accessed. Comprimise will have to be sought. The WOW trail debate could go on for years with legal battles etc this can drag it on Ad infinitum.

Last edited by laketrout; 08-28-2008 at 06:37 PM. Reason: spelling correction