Quote:
Originally Posted by boat_guy64
I too am wondering the same thing. I see the roll out versions with 8 foot extensions. If they are placed on land and and not even touching the water are there any restrictions and permits required?
|
I'd be curious to get that answer as well. I did a PBN for my PWC lift but one of the things they seemed most concerned about was that the lift was adjacent to my existing dock, essentially taking up one of my slips. You are allowed X number of slips based on frontage. By adding a lift and not taking up one of those slips you are skirting the rules by adding another slip. I don't know if the Jet-Docks need a PBN or not, but because they do take up a slip space I have no doubt they would give you one.