Good. If there was a long-term benefit to NH, and the wires would be buried rather than on giant towers, things might be different.
Sent from my Moto G (5S) Plus using Tapatalk |
![]() |
![]() |
![]() |
#3 |
Senior Member
|
![]()
Good for the NH Site Evaluation Committee ....... the transmission line was planned to go straight down Main St in Plymouth taking two years to install underground ..... it would totally mess up the free parking spots..... and make getting a 50-cent cup of hardware store coffee difficult ......if not impossible ....... what really matters ....... el cheapo coffee!
__________________
... down and out, liv'n that Walmart side of the lake! Last edited by fatlazyless; 02-02-2018 at 05:16 AM. |
![]() |
![]() |
![]() |
#4 |
Senior Member
Join Date: Oct 2004
Location: Laconia NH
Posts: 5,571
Thanks: 3,209
Thanked 1,101 Times in 793 Posts
|
![]()
There is another project to add more capacity to the existing line that runs through NH. It's already an eyesore so adding to it would not make much difference.
http://www.nhbr.com/January-19-2018/...nt-initiative/
__________________
Someday may never be an actual day. |
![]() |
![]() |
![]() |
#5 | |
Senior Member
Join Date: Oct 2010
Posts: 2,028
Thanks: 603
Thanked 687 Times in 425 Posts
|
![]() Quote:
![]()
__________________
It's never crowded along the extra mile. |
|
![]() |
![]() |
Sponsored Links |
|
![]() |
#6 |
Senior Member
Join Date: Apr 2004
Location: Kuna ID
Posts: 2,755
Thanks: 246
Thanked 1,942 Times in 802 Posts
|
![]()
Yes and no. While at the present moment there may not be an immediate need for additional capacity, at some point based on the rate of consumption the ability to provide ample power and reliably distribute it will need to be addressed. There is no doubt power consumption is on the rise. Whether or not the proposed Northern Pass was the best option to address this of course has been a point of contention for years now. Eventually something will need to be done, hopefully more thought is put into the next proposal which will garnish more public support.
|
![]() |
![]() |
![]() |
#7 |
Senior Member
Join Date: Feb 2015
Location: Tilton/Paugus Bay
Posts: 239
Thanks: 13
Thanked 64 Times in 45 Posts
|
![]()
I am sure that if MA did a bit more themselves to allow cleaner energy in, or provide benefit to NH, folks in NH would be more inclined to give to the cause.
But when MA shots down things like offshore windmills (NIMBY mentality) then why expect NH to level forests and tourist areas.. *shrug* Same reason NH folks shot down the high volume gas pipeline that was to cut through Mason/Nashua/Husdon/Pelham to get gas into Dracut MA, because MA towns did not want to gut through their own land. |
![]() |
![]() |
![]() |
#8 | |
Senior Member
Join Date: Jul 2014
Posts: 6,223
Thanks: 1,171
Thanked 2,055 Times in 1,275 Posts
|
![]() Quote:
Sent from my Moto G (5S) Plus using Tapatalk |
|
![]() |
![]() |
![]() |
#9 |
Senior Member
Join Date: Mar 2015
Posts: 648
Thanks: 316
Thanked 120 Times in 93 Posts
|
![]()
Right, That's the whole thing right there. I'd love to know what was promised to the NH politicians who would sell out for so little impact on our power needs. There was going to be money going somewhere. We need more power, This wasn't it.
|
![]() |
![]() |
![]() |
#10 | |
Senior Member
Join Date: Jan 2007
Posts: 529
Thanks: 83
Thanked 194 Times in 118 Posts
|
![]() Quote:
|
|
![]() |
![]() |
![]() |
#11 |
Senior Member
Join Date: Jul 2005
Location: Thornton's Ferry
Posts: 1,302
Thanks: 67
Thanked 171 Times in 127 Posts
|
![]()
We don't need more electricity anyway. We all have generators!
![]() |
![]() |
![]() |
![]() |
#12 |
Senior Member
Join Date: Jun 2016
Location: Tuftonboro and Sudbury, MA
Posts: 2,378
Thanks: 1,278
Thanked 1,017 Times in 627 Posts
|
![]()
The fundamental problem with grid "improvements" is that the utility gets paid just for making them, even if they are not necessary today or in the near future. So Eversource's profit motive is to make a case that they are needed, and then build, build, build. This is very different from other businesses that take a risk when they expand, and then get paid only if customers buy more.
|
![]() |
![]() |
![]() |
#13 |
Senior Member
|
![]()
.... and, here's a photo of Main Street-Plymouth, which was the planned NH-Route 3 route for the Northern Pass electric transmission line, running down Plymouth's Main St, underground, that shows the Rand's Hardware, been there since 1908, the free parking spaces out front with cars parked, angle style like from 1933, and the 50-cent k-cup coffee is on the right inside...
http://www.unionleader.com/in-Plymou...ss-is-finished ....well, well, well, and how's about that ...... everyone reading this wants to be going to Rand's Hardware & Rental and buy or rent something very, very expensive, like an on sale snowblower, a small Caterpillar excavator or a Ditch Witch trencher ...... Wednesday's starting at 7-am is half price rental day ...... like, no kidding! They will be happy to sell you anything in the store!
__________________
... down and out, liv'n that Walmart side of the lake! |
![]() |
![]() |
![]() |
#14 |
Senior Member
Join Date: Jul 2005
Location: Thornton's Ferry
Posts: 1,302
Thanks: 67
Thanked 171 Times in 127 Posts
|
![]()
I agree that it would be a bad idea to route this through a town center. The local infrastructure needs will eventually impact and be impacted by the power line. Plus, of course, the gross disruption during construction.
But, the terms 'grid' and 'power pool' are used for reasons. Using NP to provide power elsewhere frees up power in the pool for other areas including ours. In the event our supply lines are disrupted there is the capability to route some of Hydro Quebec's power to other areas. Saying a flat-out "No!" is just as dumb as routing NP through Main Street. |
![]() |
![]() |
![]() |
#15 | |
Senior Member
Join Date: Jun 2016
Location: Tuftonboro and Sudbury, MA
Posts: 2,378
Thanks: 1,278
Thanked 1,017 Times in 627 Posts
|
![]() Quote:
True, but it's also true that we could get much more energy security by reducing consumption. Our recent move has really opened my eyes on this front. In Mass, we just went from a 30 year old poorly insulated house with oil heat to a new well-insulated home with electric heat pump inverters. The new place is 2/3's of the size of the old. Our combined oil and heat bills have fallen by 2/3's! Further, we're about to install solar, and those numbers look great too. So we still need the grid, but with no tree-hugging, sweater-wearing and shivering sacrifice, we're going to end up reducing our utility bills by something like 90%. I wish we had woken up earlier. We should have insulated the old place 20 years ago and added some Mitsubishi inverters when they became available. |
|
![]() |
![]() |
![]() |
#16 |
Senior Member
Join Date: Feb 2015
Posts: 831
Thanks: 114
Thanked 210 Times in 132 Posts
|
![]()
Sounds like a wash to me.
|
![]() |
![]() |
![]() |
#17 |
Senior Member
Join Date: Feb 2015
Location: Tilton/Paugus Bay
Posts: 239
Thanks: 13
Thanked 64 Times in 45 Posts
|
![]()
Inverted math.
![]() Think of it as the house is 1/3 smaller and the consumption is 2/3's less. (When he said 2/3's the size you think 2/3rds smaller) FWIW, I've been doing the same, replaced baseboard heat to radiant hydronic, replaced all lights with LED, replaced old worn probably 70% efficient boiler with a new 89% efficient and my next step is moving from an electric hot water heater to an indirect hot water tank. |
![]() |
![]() |
![]() |
#18 |
Senior Member
Join Date: Jun 2016
Location: Tuftonboro and Sudbury, MA
Posts: 2,378
Thanks: 1,278
Thanked 1,017 Times in 627 Posts
|
![]()
Pat's right--my bills have fallen by twice as much as one would expect with equal conditions. (I also left out some usage details which makes the savings even more.)
Every home is different, but just about any typical utility customer can cut their bill sharply with modest investments. |
![]() |
![]() |
![]() |
#19 | |
Senior Member
Join Date: Sep 2009
Location: Mirror Lake - Full time resident
Posts: 398
Thanks: 70
Thanked 156 Times in 61 Posts
|
![]() Quote:
|
|
![]() |
![]() |
![]() |
#20 |
Senior Member
Join Date: Oct 2004
Location: Laconia NH
Posts: 5,571
Thanks: 3,209
Thanked 1,101 Times in 793 Posts
|
![]()
New England Power auction shows there is sufficient electric resources. Cost is the lowest in 5 years. Hopefully this cost will lower our bills.
http://www.vermontbiz.com/news/2018/...ower-cost-2021
__________________
Someday may never be an actual day. |
![]() |
![]() |
![]() |
#21 | |
Senior Member
Join Date: Feb 2015
Location: Tilton/Paugus Bay
Posts: 239
Thanks: 13
Thanked 64 Times in 45 Posts
|
![]() Quote:
If I recall it basically went like this:
Meanwhile, it is uncovered that the owners of the line are ex-ENRON exec's (you know those nice guys), as they quietly got existing Canada to Dracut pipeline relicensed to be able to reverse flow from Dracut to the St. Lawrence Seaway port. So basically let us chop up your states so we can store in Dracut and then ship back up to Canada and then to Europe for 2x the price with no benefit to NH or MA but a big benny to our wallet. Forgive me, that was like 12 months of politics/haggling in 10 mins. ![]() |
|
![]() |
![]() |
![]() |
#22 |
Senior Member
Join Date: Mar 2012
Posts: 122
Thanks: 86
Thanked 46 Times in 27 Posts
|
![]()
Just as a view from the other side and perspective, the routing through downtown Plymouth would not disrupt a whole lot of business or daily activities as it was to be placed underground through a process called micro-tunneling (think Chunnel under the English Channel, just on a smaller scale). I don't want to give away too much information about the project as I work for a consultant, but if the lines are not able to go above ground, they can always be placed below ground.
The process of micro tunneling does not create an open cut and cap situation as most construction processes do and only requires two access points on either end of the tunnel. Tunnels can be made from 2-inches to 48-inches in width and can be miles long. Just want to bring another prospective to this discussion. |
![]() |
![]() |
![]() |
#23 | |
Senior Member
Join Date: Jun 2016
Location: Tuftonboro and Sudbury, MA
Posts: 2,378
Thanks: 1,278
Thanked 1,017 Times in 627 Posts
|
![]() Quote:
No one was complaining about a micro tunnel in downtown Plymouth. The complaint is the macro damage done across miles of beautiful countryside. |
|
![]() |
![]() |
![]() |
#24 | |
Senior Member
Join Date: Apr 2004
Posts: 1,177
Thanks: 664
Thanked 943 Times in 368 Posts
|
![]() Quote:
![]() |
|
![]() |
![]() |
![]() |
#25 |
Senior Member
Join Date: Sep 2008
Location: Meredith Bay & LI, NY
Posts: 3,222
Thanks: 1,219
Thanked 1,009 Times in 649 Posts
|
![]()
Those windmills completely destroyed the mountain side view.
Sent from my iPhone using Winnipesaukee Forum mobile app |
![]() |
![]() |
![]() |
#26 |
Senior Member
Join Date: Jun 2016
Location: Tuftonboro and Sudbury, MA
Posts: 2,378
Thanks: 1,278
Thanked 1,017 Times in 627 Posts
|
![]()
SP/Joey--Don't we have enough to disagree on already? I've never posted in favor of wind power, and would never advocate something that would harm the Whites.
If memory serves, all of my energy posts have been on solar power and insulation. Unless you're in the oil or coal business, I'm not sure there's anything to dislike about them. Most simply describe the huge financial advantages to going green. |
![]() |
![]() |
![]() |
#27 | |
Senior Member
Join Date: Apr 2004
Posts: 1,177
Thanks: 664
Thanked 943 Times in 368 Posts
|
![]() Quote:
|
|
![]() |
![]() |
![]() |
#28 | |
Senior Member
Join Date: Sep 2008
Location: Meredith Bay & LI, NY
Posts: 3,222
Thanks: 1,219
Thanked 1,009 Times in 649 Posts
|
![]() Quote:
|
|
![]() |
![]() |
![]() |
#29 |
Junior Member
Join Date: Feb 2018
Location: hampstead nh
Posts: 6
Thanks: 0
Thanked 0 Times in 0 Posts
|
![]()
I'm glad NH said no to Northern pass... we don't need more tall ugly power lines in our state..
|
![]() |
![]() |
![]() |