![]() |
![]() |
|
Home | Forums | Gallery | Webcams | Blogs | YouTube Channel | Classifieds | Calendar | Register | FAQ | Donate | Members List | Search | Today's Posts | Mark Forums Read |
![]() |
|
Thread Tools | Display Modes |
![]() |
#1 |
Senior Member
Join Date: Mar 2012
Posts: 122
Thanks: 86
Thanked 46 Times in 27 Posts
|
![]()
All-
We will be installing a permanent U-shaped dock sometime this or next year, assuming the permitting is acceptable. Can people share who they have used for permanent or seasonal dock installation/construction? We are looking to narrow down the field of companies to perform the work prior to reaching out. I know the main players are Winnipesaukee Marine, Ambrose, Watermark. Thanks in advance. |
![]() |
![]() |
![]() |
#2 | |
Senior Member
Join Date: May 2006
Location: Texas, Lake Ray Hubbard and NH, Long Island Winnipesaukee
Posts: 2,870
Thanks: 1,037
Thanked 892 Times in 524 Posts
|
![]() Quote:
__________________
Life is about how much time you can spend relaxing... I do it on an island that isn't really an island..... |
|
![]() |
![]() |
![]() |
#3 |
Senior Member
Join Date: Mar 2006
Location: Merrimack and Welch Island
Posts: 4,339
Thanks: 1,339
Thanked 1,621 Times in 1,053 Posts
|
![]()
https://islandconstructionnh.com/
Ben and crew did major rebuild for us last year. Roughly 150 linear feet of dock, u-shape. This involved removing 60 year old pre-stressed concrete docks, driving pilings, adding new decks, adding new power pedestals and extending electricity. Excellent work throughout. DES is usually pretty quick with permits, but they send them to the local Conservation Commission before the application is considered complete. The CC's usually meet monthly and often push the application back if their agenda is already full for this month and/or next. They may add restrictions, so it may be worthwhile for you and your contractor to attend the meetings. |
![]() |
![]() |
The Following User Says Thank You to Descant For This Useful Post: | ||
CaptT820 (06-24-2021) |
![]() |
#5 |
Junior Member
Join Date: Sep 2020
Posts: 14
Thanks: 15
Thanked 7 Times in 5 Posts
|
![]()
We’re working with Watermark (Paul Goodwin) on a waterfront project (docks, etc) and my understanding is that DES isn’t really considering new permanent docks anymore in favor of seasonal or removable (ie crank up or removable sections on poles or floating).
A permanent dock is going to be a very tough sell and likely will need to show strong reason why the removable dock is not an option. Plus, with permanent you’ll need to think about winter ice damage |
![]() |
![]() |
Sponsored Links |
|
![]() |
#6 | |
Senior Member
Join Date: Jan 2006
Posts: 6,702
Thanks: 751
Thanked 1,454 Times in 1,011 Posts
|
![]() Quote:
|
|
![]() |
![]() |
![]() |
#7 |
Senior Member
Join Date: Jan 2005
Posts: 3,486
Thanks: 221
Thanked 810 Times in 486 Posts
|
![]()
Permanent dock usage really depends on the exposure of the property.
I will say some of the new seasonal docks are great. Dave Farley/Diversified built us a 2 piece, very long (we have no depth) seasonal last year to replace our junk pipe dock, then added a walkway and another finger (permitted of course) to it this year. He has done a permanent 3 finger crib dock for us in the past as well. It was built in 2004, and other than a re-deck its still standing strong at our old place. He is getting ready to do a hardscape project for us now. Great guy and reasonable. He is booked up like everyone else and is selective these days when taking on new clients as he has so much business servicing long term customers like us. For permitting, talk to Cynthia Folsom. She worked for DES at one point and trained existing employees so she knows her stuff. |
![]() |
![]() |
![]() |
#8 |
Senior Member
Join Date: Jul 2015
Location: weirs beach,
Posts: 300
Thanks: 39
Thanked 39 Times in 32 Posts
|
![]()
If you have a existing permanent crib dock that needs to be replaced, is that a problem as far as permitting. I once inquired about repairing ,replacing or removing my crib dock and replacing with a seasonal on, I was advised that the value of my property would decrease ( not in the eyes of the tax assessment) and that If you have a crib dock it would be best to repair or replace.
|
![]() |
![]() |
![]() |
#9 | |
Senior Member
Join Date: Aug 2013
Location: Bedford, NH; Meredith, NH
Posts: 946
Thanks: 262
Thanked 812 Times in 331 Posts
|
![]() Quote:
I worked with Watermark to replace it. They initially tried to convince me to go with another permanent dock for the reasons you sight above, (property value; if you abandon permanent now, you'll never get one in the future, etc). I was certain that I wanted a crank-up dock...I didn't want the winter hassle that comes with a permanent one, and I wanted my water's edge to be frozen in the winter for ice access. We went with the crank-up and have never looked back. (and, my property value has certainly NOT decreased...) |
|
![]() |
![]() |
![]() |
#10 |
Senior Member
Join Date: Aug 2013
Location: Bedford, NH; Meredith, NH
Posts: 946
Thanks: 262
Thanked 812 Times in 331 Posts
|
![]()
....I knew right after I put up my previous post that I used the wrong spelling for "cite". Sorry, I'm a spelling and grammar snob, all thanks to Mrs Long back in 10th grade English many moons ago....
(This should make the teachers on the forum happy ![]() |
![]() |
![]() |
The Following User Says Thank You to MeredithMan For This Useful Post: | ||
CubRun (03-31-2022) |
![]() |
#11 | |
Senior Member
Join Date: Jul 2014
Posts: 6,212
Thanks: 1,167
Thanked 2,048 Times in 1,271 Posts
|
![]() Quote:
PS As an English teacher, it's BRUTAL to be active in online forums. PPS I see permission to be playful given our PM thread, but feel free to tell me to pound sand. Sent from my SM-G950U using Winnipesaukee Forum mobile app |
|
![]() |
![]() |
The Following User Says Thank You to thinkxingu For This Useful Post: | ||
CubRun (03-31-2022) |
![]() |
#12 | |
Senior Member
Join Date: Aug 2013
Location: Bedford, NH; Meredith, NH
Posts: 946
Thanks: 262
Thanked 812 Times in 331 Posts
|
![]() Quote:
|
|
![]() |
![]() |
The Following User Says Thank You to MeredithMan For This Useful Post: | ||
thinkxingu (07-03-2021) |
![]() |
#13 |
Senior Member
Join Date: Jul 2015
Location: weirs beach,
Posts: 300
Thanks: 39
Thanked 39 Times in 32 Posts
|
![]()
Other than Watermark, Ambroise or Winni Marine, has any one had any other recommendations for permanent dock repair/replace companies that work on Winni.
|
![]() |
![]() |
![]() |
#14 |
Senior Member
Join Date: Jul 2009
Location: San Francisco/Meredith
Posts: 1,563
Thanks: 660
Thanked 670 Times in 344 Posts
|
![]()
Doesn't a permanent dock increase your property Tax?
__________________
Gary ~~~~_/) ~~~ ~~~~~~~~ |
![]() |
![]() |
![]() |
#15 |
Senior Member
Join Date: Mar 2006
Location: Merrimack and Welch Island
Posts: 4,339
Thanks: 1,339
Thanked 1,621 Times in 1,053 Posts
|
![]()
Island Construction rebuilt our 60 year old permanent dock. Good work, stuck to the original price estimate. It took longer than expected because of delays in getting Trex decking. Work involved driving new pilings, removal of old pre-stressed concrete dock. We should be good for another 60 years. That's a permanent dock for me.
|
![]() |
![]() |
![]() |
#16 |
Senior Member
Join Date: Jun 2009
Posts: 248
Thanks: 26
Thanked 134 Times in 61 Posts
|
![]()
No dock is permanent once that ice starts moving. I have a grandfathered dock that is very large and unique so I love having it but the first ice out after purchase (2012) it was ripped apart by moving ice. Fixed it and no problems since but every spring is a hold your breath moment till the ice is gone. If I was starting from scratch I would go with a crank up and avoid the worries. Had one installed by Watermark at my old place and it was great. I believe you are allowed a 40 ft crank up but only 30 ft if permanent so that may be a factor as well.
|
![]() |
![]() |
![]() |
#17 |
Senior Member
Join Date: Jan 2006
Posts: 6,702
Thanks: 751
Thanked 1,454 Times in 1,011 Posts
|
![]()
I agree winterh. We don't have to adjust the posts every year now that we have a crank up. I also believe the state doesn't want a permanent dock any more unless you are grandfathered.
|
![]() |
![]() |
![]() |
#18 |
Senior Member
Join Date: Feb 2005
Location: Gilford, NH and Florida
Posts: 2,989
Thanks: 696
Thanked 2,195 Times in 930 Posts
|
![]()
You are allowed to replace your dock with a dock of up to the same size. I have two crank ups, one is 47 feet and it replaced a 47 foot seasonal (pipe) dock.
After cranking the two docks up every year for the past 15 years, I bought a 12 volt electric winch at Harbor Freight that works great. I take it out once a year and it mounts on a tree. Pushing the button is way easier! |
![]() |
![]() |
![]() |
#19 | |
Senior Member
Join Date: Jan 2005
Posts: 3,486
Thanks: 221
Thanked 810 Times in 486 Posts
|
![]() Quote:
Dock length is dictated by frontage and depth. You are correct on the standards being 40' for crank up. A permanent depends on depth. The definition of a slip comes into play, which is 25' of length once you hit 3' of depth at full lake. Ours were 30' long for the inner slips as we had plenty of depth. The outer sides were 36' because of attaching walkway. https://www.des.nh.gov/sites/g/files...0-01/wb-19.pdf Our new seasonal/removable dock (permitted) on Bear is 75' long, with a U starting at about 50' out to one side. We are very shallow to say the least! |
|
![]() |
![]() |
![]() |
#20 | |
Senior Member
Join Date: Jan 2005
Posts: 3,486
Thanks: 221
Thanked 810 Times in 486 Posts
|
![]() Quote:
Watermark is awesome, but plan on waiting a year or two due to their workload. Ambrose quoted me ridiculous pricing on some projects a while back so I have stayed away. |
|
![]() |
![]() |
![]() |
#21 |
Senior Member
Join Date: Mar 2012
Posts: 122
Thanks: 86
Thanked 46 Times in 27 Posts
|
![]()
To answer the original tax question. In some communities (Alton), you do get taxed separately for your dock/breakwater if it is permanent.
I spoke with DES recently and they do not necessarily want permanent docks, but will allow them. Something to keep in mind is that permanent docks can typically only be 30-ft in length 6-ft wide, unless grandfathered. Even a U-shaped dock can only be 12-ft wide in the middle berth and then 30-ft long on each finger. A crank-up style dock can be 40-ft long on each finger. We are going with Tobin at Ambrose marine to construct ours, but he is 18 months out right now, so it'll be a bit of a wait. NHDES is 37-40 days out on permit reviews right now too, so get those in early if you need one. |
![]() |
![]() |
![]() |
#22 | |
Senior Member
Join Date: Jan 2006
Posts: 6,702
Thanks: 751
Thanked 1,454 Times in 1,011 Posts
|
![]() Quote:
Good for you! Tobin is great! |
|
![]() |
![]() |
![]() |
Bookmarks |
Thread Tools | |
Display Modes | |
|
|