Driving thru the bay today it looks like they have excavated and poured a new foundation at the sight. Does anyone know what they are going to build ? It looks like they are going to make it walk out lower level to the lake. I heard they were trying to construct a 2 story building there.
|
![]() |
![]() |
![]() |
#2 |
Senior Member
Join Date: Sep 2003
Posts: 1,943
Thanks: 23
Thanked 111 Times in 51 Posts
|
![]()
The foundation went up in the last 2 weeks. Sure looks bigger (?) than the old building and I'm guessing there's basements where there weren't before. Don't know if it's going to be taller.
__________________
Mee'n'Mac "Never attribute to malice that which can be explained by simple stupidity or ignorance. The latter are a lot more common than the former." - RAH |
![]() |
![]() |
![]() |
#3 |
Senior Member
Join Date: Jul 2002
Location: Alton Bay on the mountain by a lake
Posts: 2,023
Thanks: 563
Thanked 444 Times in 311 Posts
|
![]()
I have noticed all the work going on down there for the past several weeks, but haven't had time to stop and see just what was going on. It appears that the town has allowed them to put all the excavated materails in the parking area. Am I seeing right???
![]()
__________________
|
![]() |
![]() |
![]() |
#4 | |
Senior Member
Join Date: Jan 2003
Location: Alton Bay
Posts: 5,600
Blog Entries: 2
Thanks: 2,461
Thanked 1,982 Times in 1,083 Posts
|
![]() Quote:
And the town allowed the contractor to put the fill in the parking lot for now, but there was a time limit (3 months for completion of the dirt thing, i think.).
__________________
I Live Here... I am always UPTHESAUKEE !!!! |
|
![]() |
![]() |
![]() |
#5 |
Junior Member
Join Date: Nov 2005
Posts: 6
Thanks: 0
Thanked 0 Times in 0 Posts
|
![]()
If you don't think the dirt is a problem in a public lot, stop in and talk to the owners of the Old Alton Bay diner.
|
![]() |
![]() |
Sponsored Links |
|
![]() |
#6 |
Senior Member
Join Date: Jul 2002
Location: Meredith, NH
Posts: 1,686
Thanks: 1,203
Thanked 675 Times in 178 Posts
|
![]()
Here are two photos I shot today of the new pavilion's foundation.
![]() ![]()
__________________
DRH |
![]() |
![]() |
![]() |
#7 |
Senior Member
Join Date: Jul 2002
Location: Rock Haven Lake - West Newfield, ME
Posts: 5,367
Thanks: 374
Thanked 1,057 Times in 495 Posts
|
![]()
Just saw this on e-bay. Pavilion memorabilia. Anyone got an extra $850 or so?
HERE'S the LINK (It will only last a few days) ![]() While I'm at it....Let me add one of fpartri497"s photos to this thread to show the ongoing construction ![]() |
![]() |
![]() |
![]() |
#8 |
Senior Member
Join Date: Jul 2002
Location: Concord NH
Posts: 681
Thanks: 97
Thanked 48 Times in 39 Posts
|
![]()
drove by the new construction of the pavillion today, and they are allmost finished framing the first floor. Wow they are moving quickly.
![]()
__________________
![]() ![]() |
![]() |
![]() |
![]() |
#9 |
Senior Member
Join Date: Nov 2006
Posts: 51
Thanks: 0
Thanked 0 Times in 0 Posts
|
![]()
I'm glad to see progress being made.
I feel this is good for the owner, and the town to not let things wallow after the fire. I wish them dry weather for a fast build! |
![]() |
![]() |
![]() |
#10 |
Senior Member
Join Date: Mar 2003
Location: Merrymeeting Lake, New Durham
Posts: 2,226
Thanks: 302
Thanked 800 Times in 368 Posts
|
![]()
Looking at the water level in the photo, not sure I'd want to have one of those basements, no matter what the price!
![]() |
![]() |
![]() |
![]() |
#11 |
Senior Member
Join Date: Apr 2004
Location: Lakes Region
Posts: 681
Thanks: 21
Thanked 94 Times in 63 Posts
|
![]()
hard to reconcile that photo and the proposed legislation prohibiting the removal of any vegetation within 50 ft of shore...
|
![]() |
![]() |
![]() |
#12 |
Senior Member
Join Date: Apr 2004
Location: Suncook, NH, but at The Lake at Heart
Posts: 2,615
Thanks: 1,083
Thanked 434 Times in 210 Posts
|
![]()
Only 71 views as of right now and 0 bids
![]() ![]()
__________________
Just Sold ![]() At the lake the stress of daily life just melts away. Pro Re Nata |
![]() |
![]() |
![]() |
#13 |
Senior Member
Join Date: Jul 2002
Location: Rock Haven Lake - West Newfield, ME
Posts: 5,367
Thanks: 374
Thanked 1,057 Times in 495 Posts
|
![]()
See this recent Citizen Article about the Pavilion entitled "RISING FROM THE ASHES"
|
![]() |
![]() |
![]() |
#14 |
Senior Member
Join Date: Nov 2006
Location: Saugus, MA and Gilford, NH
Posts: 68
Thanks: 8
Thanked 1 Time in 1 Post
|
![]()
Are these residential or commercial condos?
|
![]() |
![]() |
![]() |
#15 |
Senior Member
Join Date: Sep 2003
Location: Gilmanton, NH
Posts: 754
Thanks: 136
Thanked 93 Times in 51 Posts
|
![]()
residential
|
![]() |
![]() |
![]() |
#16 | |
Senior Member
Join Date: May 2007
Posts: 248
Thanks: 6
Thanked 5 Times in 5 Posts
|
![]() Quote:
![]() |
|
![]() |
![]() |
![]() |
#17 |
Senior Member
Join Date: Sep 2003
Location: Gilmanton, NH
Posts: 754
Thanks: 136
Thanked 93 Times in 51 Posts
|
![]()
Its been so long that I forgot the original proposal (and the one I believe was approved) was for seven condominium units with a retail shop or two in the front of the building facing the parking lot. Just was never much talk about the commercial units. There are 2 of the residential units in MLS, one for $549,000 and the other for 699,000 (ouch)
|
![]() |
![]() |
![]() |