Taking dock out
I've pulled up lame on my left foot/leg. Don't know how long it will take to heal. Thankfully the weather is still holding.
Just in case I need to have somebody else do the work, is there persons/company that take out docks. Thought I read before but couldn't find it.
My dock is easy, I have 5 sections that are each 7' long with galvanized pipe holding dock up. Process is remove bolts on brackets that hold dock, lift back section onto previous section, loosen bolts for pipe, lift front end(use anchor), slide pipe out, move section to land, repeat 5 times. You need 4 persons, 2 in water, 2 out.
Thanks in advance
Dave M
|