![]() |
![]() |
|
Home | Forums | Gallery | Webcams | Blogs | YouTube Channel | Classifieds | Register | FAQ | Donate | Members List | Search | Today's Posts | Mark Forums Read |
|
Thread Tools | Display Modes |
![]() |
#3 |
Senior Member
Join Date: Mar 2006
Location: Merrimack and Welch Island
Posts: 4,413
Thanks: 1,366
Thanked 1,636 Times in 1,068 Posts
|
![]()
Where are you? Having to move a barge long distance may not be something the operator wants to do. You may not want to pay for that.
I think it may be more a matter oi "when can they do the work?" Most operators have a big spring backlog. I'd call whoever did the original installation, if known. We used to have a couple of pilings at the end of our breakwater/docks and had to reset them often. Finally pulled them out and went without. No problem ever since. |
![]() |
![]() |
Bookmarks |
Thread Tools | |
Display Modes | |
|
|