Go Back   Winnipesaukee Forum > Winnipesaukee Forums > Home, Cottage or Land Maintenance
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQ Members List Donate Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 05-21-2010, 10:23 AM   #2
RLW
Senior Member
 
RLW's Avatar
 
Join Date: Jul 2002
Location: Alton Bay on the mountain by a lake
Posts: 2,023
Thanks: 563
Thanked 444 Times in 311 Posts
Default

Quote:
Originally Posted by IslandRadio View Post
Hi !

I need to construct a shop outbuilding behind the main cottage, and I can't seem to find any information about how far such a structure has to be from the septic system leach field.
I do not believe there is any. It just needs to be far enough away so that you do not hit it when excavating for the foundation which has to be 4' down so it is below the freeze line. If it were me the first thing I would do is go and talk to the building inspector as he is the one with the last word plus you have to be so many feet from all property lines.
__________________
There is nothing better than living on Alton Mountain & our grand kids visits.
RLW is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 01:44 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.08383 seconds