Pursuant to Wetlands Rule Env-Wt 303.05 (h), Hand raking of leaves or other organic debris from the shoreline or lakebed can be done without a wetlands permit provided that:
(1) At the time raking is done, the area raked is exposed by drawdown; or
(2) Raking does not disturb vegetative roots and is limited to 900 square feet of area.

Please note that this provision is limited to leaves and organic debris. As soon as one starts to move soil a permit is required. There is currently no minimum impact provision for any excavation or fill within lakebeds. The standard application route is the only one available. If one is removing less than 20 cu yd of material, the project is classified as a minor impact project. If one is removing 20 cu yd or more then the project is classified as a major impact project and requires Governor and Executive Council approval. Any application to place fill such as sand within the lakebed is automatically classified a major and in need of Governor and Executive Council approval as well.
Onshore is offline   Reply With Quote
The Following 2 Users Say Thank You to Onshore For This Useful Post:
Mirror Lake's BB (04-19-2012), Winnisquamguy (04-19-2012)
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 11:00 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.48033 seconds