![]() |
![]() |
|
Home | Forums | Gallery | Webcams | Blogs | YouTube Channel | Classifieds | Calendar | Register | FAQ | Donate | Members List | Today's Posts | Search |
|
Thread Tools | Display Modes |
![]() |
#9 |
Senior Member
Join Date: Jun 2008
Location: Portsmouth. RI
Posts: 2,231
Thanks: 400
Thanked 460 Times in 308 Posts
|
![]()
Our Town Owned 1.5 MW Turbine has been inactive since June 16 with a broken gearbox. The engineers report just came back yesterday. Lots of metal shavings in the oil. Gears and bearings chewed up.
![]() The engineers are calling our turbine an orphan. It seems 3 out of the 5 of this turbine (AAER Canada..now defunct) installed in the U.S. has failed the gearbox at around 3 years. Ours is just over that. The warranty was for two years. SO: AFTER we spend $800K to fix it, the report says.. AND... IF the new gearbox...same model as the last, lasts 10 years, with all routine expences and income considered....the turbine will run a deficit of ($400K) per year. We still owe $2.4M on the current loan. ![]() I used to like this machine. Let the buyer beware. NB |
![]() |
Bookmarks |
|
|