Go Back   Winnipesaukee Forum > Winnipesaukee Forums > General Discussion
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQ Members List Donate Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 12-31-2018, 03:43 PM   #32
TiltonBB
Senior Member
 
Join Date: Feb 2005
Location: Gilford, NH and Florida
Posts: 3,039
Thanks: 715
Thanked 2,215 Times in 944 Posts
Default

Quote:
Originally Posted by joey2665 View Post
Disagree. It does not necessarily increase costs to keep the old structure. I am sure the way it has been incorporated into the new structure they ended up saving money along the way
By the time you get through working around the existing building the old building offered several challenges that a clean slate (empty lot) would not have.

The architect had to make plans that would incorporate the old building and change everything from the structural support to every segment of the entire layout because of that building. It is different from what a regular new construction design would have required. That additional design time costs money.

Hazardous materials would have to be removed from the old building. That would include any asbestos and any oil that may have leaked from old vehicles in the building. None of the old wiring could be used because it was out of code. The old building had to be completely rewired. The old brick had to be re-pointed and stabilized so that it did not present a hazard in the new building. Any old wood in the building had to be treated for termites and other issues and that will be an ongoing expense.

HVAC plumbing required numerous re-channeling efforts to get around the blockage cause by the old building. That eliminated the opportunity for straight runs typical of most new construction. It also required that additional utility outlets for lighting, heating, and air conditioning be installed so that it would cover and circulate throughout the structure. The old building could only be improved so much and will continue to be an additional expense for years to come.

I will take a clean slate any day. It will cost less and you can design what you want without restriction.
TiltonBB is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 01:51 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.27353 seconds