Go Back   Winnipesaukee Forum > Winnipesaukee Forums > Home, Cottage or Land Maintenance
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQDonate Members List Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 01-01-2012, 10:01 AM   #5
Kamper
Senior Member
 
Kamper's Avatar
 
Join Date: Jul 2005
Location: Thornton's Ferry
Posts: 1,307
Thanks: 67
Thanked 172 Times in 128 Posts
Default

Definitly with ground! I'm also going to put a GFCI outlet on the washer outlet, and the ones near the kitchen and bathroom sinks.

I'm still in the 'reconaisance' mode of this job. I've found a couple things that are going to need profesional attention but the seller was supposed to deal with those within one month of the closing, I'm hopeful that what has been done with the C/B box and meter are not considerred finished!

The newly installed breaker box has no master shut-off and they hung a meter above the meter box and duct-taped the whole where the meter should have been!

I have a licensed eletrician that I can trust with those jobs though, if she can't get the seller to finish them. Meters and masters are outside my comfort zone. I'll let you know what other surprises I ifnd.
Kamper is offline   Reply With Quote
Sponsored Links
 

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 06:56 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.17305 seconds