|  |  | 
| 
 | |||||||
| Home | Forums | Gallery | Webcams | Blogs | YouTube Channel | Classifieds | Register | FAQ | Members List | Donate | Search | Today's Posts | Mark Forums Read | 
|  | 
|  | Thread Tools | Display Modes | 
|  03-06-2017, 12:00 PM | #1 | 
| Senior Member Join Date: Mar 2012 
					Posts: 122
				 Thanks: 86 
		
			
				Thanked 46 Times in 27 Posts
			
		
	 |  Crank up Dock Options 
			
			Has anyone ever investigated how one could turn a stationary dock into a tilt up/crank up dock?  I realized last year how much of a pain it is to take out an island dock in November.  My wife and I maximize the season from April to November which makes for some chilly install/removal procedures. I know that the tilt up docks are typically truss frame construction, so I was thinking that to make a stationary into a tilt up that you would have to install some sort of gusset style plate across the sections for bracing (similar to how a girder style bridge is strengthened). I contacted FWM (the manufacturer of our dock) and they are looking into whether or not something could be fabricated. I would love to know if anyone has accomplished this or thought about doing this in the past. Thanks | 
|   |   | 
|  03-06-2017, 02:30 PM | #2 | 
| Senior Member Join Date: Apr 2004 Location: Kuna ID 
					Posts: 2,755
				 Thanks: 246 
		
			
				Thanked 1,942 Times in 802 Posts
			
		
	 |   
			
			What is the construction of your current dock?
		 | 
|   |   | 
|  03-06-2017, 02:53 PM | #3 | 
| Senior Member Join Date: Nov 2016 Location: Waltham Ma./Meredith NH 
					Posts: 4,263
				 Thanks: 2,310 
		
			
				Thanked 1,230 Times in 788 Posts
			
		
	 |   | 
|   |   | 
|  03-07-2017, 09:27 AM | #4 | 
| Senior Member Join Date: Nov 2010 
					Posts: 170
				 Thanks: 13 
		
			
				Thanked 70 Times in 43 Posts
			
		
	 |   
			
			I have Three 6 ft x 40 ft used aluminum crank up docks that I took in on trade if your interested. Looking for a couple thousand each...
		 | 
|   |   | 
|  03-07-2017, 10:21 AM | #5 | 
| Senior Member Join Date: Jul 2007 
					Posts: 395
				 Thanks: 4 
		
			
				Thanked 26 Times in 24 Posts
			
		
	 |  permits 
			
			You will have to apply for town/state permits to put lift dock in since you'll have to put a base down(hinge point) and especially if its bigger than the one you have. Also will probably be taxed for the lift dock. I converted my wooden sectional to lift dock after 40 years of putting in/out. Took months to get everything done.  Dave M | 
|   |   | 
| The Following User Says Thank You to Dave M For This Useful Post: | ||
| CaptT820 (03-07-2017)  | ||
| Sponsored Links | 
|  | 
|  03-07-2017, 12:10 PM | #6 | 
| Senior Member Join Date: Mar 2012 
					Posts: 122
				 Thanks: 86 
		
			
				Thanked 46 Times in 27 Posts
			
		
	 |  Dock Construction 
			
			The current construction of the dock is two 10'x4' sections with posts on the outer end and at the middle with cross bracing.  We set the inland section of dock on a piece of angle iron that is bolted into one of our many shoreline boulders. Sluggo-Do you know the manufacturer of the crank up docks that you have? Dave M- Do we need a permit for the anchor point, if it is a natural object (boulder) and does not require concrete to be poured or placed? I am not sure if they tax crank up docks in Alton where we are. Ill have to look into that. I would ask my neighbors, but they all have permanent wood crib docks. We have the remnants of an old crib style wood dock at the shoreline, but we are not grandfathered to use it according to DES because it has not been permitted in the last five years. | 
|   |   | 
|  03-07-2017, 02:56 PM | #7 | 
| Senior Member Join Date: Jan 2005 
					Posts: 3,551
				 Thanks: 222 
		
			
				Thanked 834 Times in 504 Posts
			
		
	 |   
			
			Why not just do a Permit by Notification and install a single 6x40'? No crazy permitting/wait time required.  http://www.des.nh.gov/organization/d.../project-1.pdf I could be wrong, but I do not recall a separate permit process being needed to install a base point on shore. Watermark does tons of these yearly. | 
|   |   | 
|  03-07-2017, 03:31 PM | #8 | 
| Senior Member Join Date: Mar 2006 Location: Merrimack and Welch Island 
					Posts: 4,475
				 Thanks: 1,387 
		
			
				Thanked 1,667 Times in 1,086 Posts
			
		
	 |  Who owns the boulder? 
			
			From CaptT820: Do we need a permit for the anchor point, if it is a natural object (boulder) and does not require concrete to be poured or placed?" Interesting question. I suspect the answer is another question: Is the boulder fully yours, i.e. above the high water mark, or is it partially in the water? What's the cost analysis? You have to buy a new dock, and (pay?) to dispose of the old one. A crank up is considered taxable (probably not much. Does it affect the total value of the property?) Permit efforts and fees? Will you have to barge the new dock to your site? Temporary seasonal dock is usually not taxed and you already own it. There are lots of folks who will install and remove your dock seasonally. Probably cheaper than you think. Always nice to have an ongoing relationship with somebody to do various projects that require a professional or special equipment/tools. (Insert plug for Island Support Services here. 293-HELP). | 
|   |   | 
|  03-07-2017, 04:13 PM | #9 | 
| Senior Member Join Date: Jun 2008 
					Posts: 50
				 Thanks: 1 
		
			
				Thanked 2 Times in 2 Posts
			
		
	 |  docks 40ft 
			
			sluggo i would like more info on your used docks i will send u a pm | 
|   |   | 
|  03-07-2017, 05:05 PM | #10 | 
| Senior Member Join Date: Nov 2010 
					Posts: 170
				 Thanks: 13 
		
			
				Thanked 70 Times in 43 Posts
			
		
	 |   
			
			Capt.   We custom build our docks here in our shop, Center Harbor Dock & Pier ... If you attach a steel header to existing shoreline stone to support the dock no permit is needed for that application. If you pour a cement pad you will need to file a PBN. if you want to remove the existing crib dock even though it is abandoned ( five year rule ) you will need to file PBN . If everything meets wetland rule and this would be the only dock on the property and you have a minimum 75 FT. of frontage a seasonal dock notification is all that's needed for permitting and that does not cost any money. Good thing to remember the only dock you can get a binder attached to you home owners insurance is a crank up dock and they will cover it for wind , tree and in some cases ice damage.
		 | 
|   |   | 
|  03-08-2017, 09:07 AM | #11 | 
| Senior Member Join Date: Mar 2012 
					Posts: 122
				 Thanks: 86 
		
			
				Thanked 46 Times in 27 Posts
			
		
	 |  PBN Process 
			
			I am very aware of the required PBN process to remove the old crib dock.  If anyone else runs into this situation and needs to perform this, please let me know as I would be happy to help.  Very lengthy and exhaustive process to remove a man-made object and return the shoreline to its original natural condition.  This is definitely one of those things that the DES should have an exception to the rule on and streamline the paperwork a lot more.   I am aware that there are people and services to remove the dock in the fall and replace in the spring, I was just looking for a more convienient way for us to do it ourselves since we extend the season to the maximum on an island. Last year our season was April 7 to November 16. We found out that our favorite months at the island were April and late October due to the absolute calm and complete lack of neighbors. | 
|   |   | 
|  03-08-2017, 01:56 PM | #12 | 
| Senior Member Join Date: Apr 2004 Location: Kuna ID 
					Posts: 2,755
				 Thanks: 246 
		
			
				Thanked 1,942 Times in 802 Posts
			
		
	 |   
			
			I have a typical wood dock that has to be assembled/disassembled every year. You can have somebody do it for you... but it ain't cheap. Last quote I got was 1K per season in and out. I decided that for a few hours of my time 2-3 in and about 1-2 hours out and 200.00 worth of wetsuit I'd do it myself.  That said being a rather young buck it's OK for now but eventually I'll replace that with a crankup, I don't think I will be so willing 20 or 30 years from now! 2K for a used crank up is a pretty good deal. | 
|   |   | 
|  03-08-2017, 10:26 PM | #13 | 
| Junior Member Join Date: Mar 2017 Location: Merrymeeting Lake - New Durham 
					Posts: 5
				 Thanks: 1 
		
			
				Thanked 0 Times in 0 Posts
			
		
	 |   
			
			Something that might be an alternative.  We put in a dock from Pier of d'Nort last year.  Once it's set up, it can be installed and removed without getting in the water.  I'm no expert but I'm impressed with quality of construction.
		 | 
|   |   | 
|  03-09-2017, 08:58 AM | #14 | 
| Senior Member Join Date: Apr 2004 Location: Meredith (Winnisquam) & Nashua, NH 
					Posts: 216
				 Thanks: 25 
		
			
				Thanked 20 Times in 17 Posts
			
		
	 |  Pier of d'Nort 
			
			Do you have a boat lift or do you tie directly to your dock?  Or maybe are in calmer waters? It seems this Pier of d'Nort approach which looks very interesting sits directly on the lake bottom and not anchored into the ground so tying a boat to this type of dock in a windy or wavy environment might move the dock. | 
|   |   | 
|  03-17-2017, 07:21 AM | #15 | 
| Senior Member Join Date: Mar 2012 
					Posts: 122
				 Thanks: 86 
		
			
				Thanked 46 Times in 27 Posts
			
		
	 |  Dock Situation 
			
			Feb- We are in a relatively wavy area. I was just looking for options on converting my existing dock to a crank up style dock, not replacing it altogether. I have also thought of building my own davit style crane that I could use to take the dock sections in and out every year. This may prove to be the more cost effective option in the long run. | 
|   |   | 
|  03-21-2017, 11:01 PM | #16 | 
| Senior Member Join Date: Sep 2009 Location: Moultonborough, NH 
					Posts: 1,515
				 Thanks: 394 
		
			
				Thanked 527 Times in 269 Posts
			
		
	 |   
			
			I recommend Raise A Dock out of Wakefield NH. Dennis is great and we love our dock.
		 | 
|   |   | 
|  03-22-2017, 03:39 AM | #17 | |
| Senior Member Join Date: Jan 2005 Location: Florida (Sebring & Keys), Wolfeboro 
					Posts: 6,034
				 Thanks: 2,280 
		
			
				Thanked 787 Times in 563 Posts
			
		
	 |  "Hybrid" Dock... Quote: 
    Start the tilt-up part anchored in the middle. The lifted span will be shorter and there'll be fewer panels to lift out. Those panels can be lag-bolted to (and stored) on the first section. To keep it out of winter's strongest winds, the tilt-up can be pulled over-center, and supported by 2x4s. That'll keep the tilt-up section protected from winds that torture—and break—one's boulder- or concrete- anchoring points and supporting tree(s). One example:  https://www.winnipesaukee.com/forums...0&postcount=25 Now I'm wondering how IslandRadio and TiltonBB have "weathered" their new docks.  https://www.winnipesaukee.com/forums...Hybrid%22+Dock . 
				__________________ Is it  "Common Sense" isn't.   Last edited by ApS; 03-22-2017 at 03:53 AM. Reason: Add picture and link... | |
|   |   | 
| The Following User Says Thank You to ApS For This Useful Post: | ||
| CaptT820 (03-24-2017)  | ||
|  | 
| Bookmarks | 
| Thread Tools | |
| Display Modes | |
| 
 | 
 |