Hi Joey2665,
Federal funding is not contingent upon building along or over the railway. Money that is allocated by the Fed to New Hampshire for alternative transportation is disbursed by DOT to projects as they see fit. I would be surprised if DOT were to allocate money to the WOW trail based upon replacing the rail line. Just saying. Jetskier ![]() |
![]() |
![]() |
The Following User Says Thank You to jetskier For This Useful Post: | ||
joey2665 (05-03-2019) |
![]() |
#2 |
Senior Member
Join Date: May 2004
Location: Weirs Beach
Posts: 1,967
Thanks: 80
Thanked 980 Times in 440 Posts
|
![]()
NH DOT can allocate the money without the need for replacing the existing railroad... Replacing the existing railroad just makes the construction costs way cheaper.
I do not see the STB, the NH DOT or the Railroad companies allowing the track to be torn up... The WOW folks need to coexist... Woodsy
__________________
The only way to eliminate ignorant behavior is through education. You can't fix stupid. |
![]() |
![]() |
![]() |
#3 |
Senior Member
Join Date: Aug 2018
Location: New Durham
Posts: 182
Thanks: 124
Thanked 99 Times in 60 Posts
|
![]()
Getting back to beating on a dead horse here!
For those in favor of the trail and who have zero regard for the railroad, this is what must be done for the rails to pulled up (see link). The railroad line up in Littleton, NH hasn't seen a train on those tracks since 1998 and it took the New Hampshire Central Railroad, up until about 2 years ago, to file a discontinuance with the STB, to remove themselves of common carrier obligations and remove themselves of a lease agreement with the state, before the state could even petition for abandonment. It's going to be an awfully tall order (if not impossible) to get the tracks shut down to build phase 3 in place of the tracks. Alta's study was supposed to wrap up at the end of April, I'm eagerly waiting to see the results of their winter long study. I imagine it will be any day now when the study is submitted to the city of Laconia. https://www.stb.gov/decisions/readin...f?OpenDocument |
![]() |
![]() |
![]() |