There are several companies out there that produce on demand concrete and have trucks that only begin mixing the ingredients to produce concrete when they reach the job site. Not sure on truck weight or barge capability, but this may be an option. All the big concrete companies offer concrete mixes that involve a retarder of some sort to allow the mix a longer hold time so it doesnt set up before it reaches the job, this is probably a good option for an island. Best days to order a concrete truck for this type of project would be when the weather is cloudy and the temperature is between 55 and 70.
CaptT820 is offline   Reply With Quote
Old 07-30-2020, 06:44 AM   #2
joey2665
Senior Member
 
joey2665's Avatar
 
Join Date: Sep 2008
Location: Meredith Bay & LI, NY
Posts: 3,222
Thanks: 1,219
Thanked 1,009 Times in 649 Posts
Default

Quote:
Originally Posted by CaptT820 View Post
There are several companies out there that produce on demand concrete and have trucks that only begin mixing the ingredients to produce concrete when they reach the job site. Not sure on truck weight or barge capability, but this may be an option. All the big concrete companies offer concrete mixes that involve a retarder of some sort to allow the mix a longer hold time so it doesnt set up before it reaches the job, this is probably a good option for an island. Best days to order a concrete truck for this type of project would be when the weather is cloudy and the temperature is between 55 and 70.
Agreed as a former concrete producer for 30+ years. On site or “batch mobiles” do not produce a quality product. Any on the larger producers can easily “retard” the concrete to give ample time for transportation to an island. I have developed mixes for WTC that were retarded for over 8 hours with great success.


Sent from my iPhone using Winnipesaukee Forum mobile app
joey2665 is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 01:03 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.22055 seconds