Go Back   Winnipesaukee Forum > Winnipesaukee Forums > General Discussion
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQ Members List Donate Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 05-23-2023, 01:16 PM   #25
Slickcraft
Senior Member
 
Join Date: Mar 2008
Location: Welch Island and The Taylor Community
Posts: 3,349
Thanks: 1,251
Thanked 2,121 Times in 970 Posts
Default

CC was on island today. The 25 pair cable was replaced from behind #54 to the entry point between #58 and #59. We now have hardwired DSL replacing the spliced temp fix. The old cable is still on the ground.
The cable on Descant's branch is still down as there is an ongoing septic install at #60.

Alan
Slickcraft is offline   Reply With Quote
The Following User Says Thank You to Slickcraft For This Useful Post:
Descant (05-23-2023)
 

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 02:15 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.19439 seconds