Default Dock/Over Water Deck Replacement

After being in place for possibly 40 years or more, our docking (30' x 6'), over-water decking (~330 SF) and breakwater (40') long ago saw their best days. We're looking to replace this system in next two or three years. I know the process can be lengthy but broadly speaking I assume the steps are (1) design, (2) permitting, (3) proposals/award, and (4) construction. We're looking to get a start now on design.

It's been awhile since I've seen any threads on recommended contractors for dock side design/construction. Ideally, we'd work with a single entity for the entire project but would definitely consider going with one firm for design and another for construction if that's more typical. We're in Meredith.

Can you provide contractors that you've worked with and would highly recommend? Any other advice is also appreciated.

Thanks.
Winilyme is offline   Reply With Quote
Old 10-05-2025, 01:43 PM   #2
TiltonBB
Senior Member
 
Join Date: Feb 2005
Location: Gilford, NH and Florida
Posts: 3,056
Thanks: 726
Thanked 2,232 Times in 953 Posts
Default Register it

You may be able to register your existing dock and that will allow repairs or replacement as long as the dimensions stay the same. That will make it exempt from permitting. I think the main requirement is that the dock remains the same size and you can document that it has been in place since 2020. In addition to any documentation you submit they will look at Google Images to see what has been in place. I just did one and it was not that difficult. I got the registration back in less than a month.

Purpose
Voluntary registration is an alternative to getting a permit for every repair or replacement of existing non-tidal permanent docking structures. It also offers owners an easier way to prove compliance with certain state statutes and rules when buying or selling properties that include these structures.

Applicability
The repair or replacement of legally existing docking structures in non-tidal waters shall be exempt from the permitting requirements of RSA 482-A:3, provided that the structures have a valid registration filed with the department by the owner of the property, in accordance with RSA 482-A:11, XI, as described in RSA 482-A:3, IV-a(b).

https://onlineforms.nh.gov/app/#/for...nhdes-w-06-096
TiltonBB is offline   Reply With Quote
The Following User Says Thank You to TiltonBB For This Useful Post:
Winilyme (10-05-2025)
Old 10-05-2025, 02:30 PM   #3
TheTimeTraveler
Senior Member
 
Join Date: Aug 2015
Posts: 928
Thanks: 296
Thanked 299 Times in 185 Posts
Default

Quote:
Originally Posted by Winilyme View Post
After being in place for possibly 40 years or more, our docking (30' x 6'), over-water decking (~330 SF) and breakwater (40') long ago saw their best days. We're looking to replace this system in next two or three years. I know the process can be lengthy but broadly speaking I assume the steps are (1) design, (2) permitting, (3) proposals/award, and (4) construction. We're looking to get a start now on design.

It's been awhile since I've seen any threads on recommended contractors for dock side design/construction. Ideally, we'd work with a single entity for the entire project but would definitely consider going with one firm for design and another for construction if that's more typical. We're in Meredith.

Can you provide contractors that you've worked with and would highly recommend? Any other advice is also appreciated.

Thanks.
I am not sure which Town you are in but your first stop may be with the building inspector.

If in fact they have your dock on file (maybe old building permit) then it should be an easy situation for you in that all you want to do is make repairs and need not to have the State involved.

The Town should have dated satellite images of your property (and dock) and that should also be evidence of your particular situation.

Hope it all works out!
TheTimeTraveler is offline   Reply With Quote
The Following User Says Thank You to TheTimeTraveler For This Useful Post:
Winilyme (10-05-2025)
Old 10-05-2025, 04:35 PM   #4
Winilyme
Senior Member
 
Join Date: Oct 2019
Location: Ice in = CT / Ice out = Winnipesaukee
Posts: 545
Thanks: 160
Thanked 310 Times in 168 Posts
Default

Quote:
Originally Posted by TiltonBB View Post
You may be able to register your existing dock and that will allow repairs or replacement as long as the dimensions stay the same. That will make it exempt from permitting. I think the main requirement is that the dock remains the same size and you can document that it has been in place since 2020. In addition to any documentation you submit they will look at Google Images to see what has been in place. I just did one and it was not that difficult. I got the registration back in less than a month.

Purpose
Voluntary registration is an alternative to getting a permit for every repair or replacement of existing non-tidal permanent docking structures. It also offers owners an easier way to prove compliance with certain state statutes and rules when buying or selling properties that include these structures.

Applicability
The repair or replacement of legally existing docking structures in non-tidal waters shall be exempt from the permitting requirements of RSA 482-A:3, provided that the structures have a valid registration filed with the department by the owner of the property, in accordance with RSA 482-A:11, XI, as described in RSA 482-A:3, IV-a(b).

https://onlineforms.nh.gov/app/#/for...nhdes-w-06-096
Never heard of this. Great information. Thank you TBB.
Winilyme is offline   Reply With Quote
Old 10-06-2025, 05:17 AM   #5
tis
Senior Member
 
tis's Avatar
 
Join Date: Jan 2006
Posts: 6,824
Thanks: 759
Thanked 1,474 Times in 1,029 Posts
Default

We just did this and it is much easier than the old permitting process.
tis is online now   Reply With Quote
Sponsored Links
Old 10-14-2025, 07:46 PM   #6
Winilyme
Senior Member
 
Join Date: Oct 2019
Location: Ice in = CT / Ice out = Winnipesaukee
Posts: 545
Thanks: 160
Thanked 310 Times in 168 Posts
Default Resending My Recent Question

I'm resending a key part of my original ask which, shortly after I posted, got caught up in some of the periodic issues where one cannot gain access to the forum. So, I'm trying again to secure feedback as follows:

"It's been awhile since I've seen any threads on recommended contractors for dock side design/construction. Ideally, we'd work with a single entity for the entire project but would definitely consider going with one firm for design and another for construction if that's more typical. We're in Meredith.

Can you provide contractors that you've worked with and would highly recommend? Any other advice is also appreciated."

Thanks.
Winilyme is offline   Reply With Quote
Old 10-15-2025, 08:12 AM   #7
Asloren1
Junior Member
 
Join Date: Sep 2020
Posts: 17
Thanks: 16
Thanked 8 Times in 6 Posts
Default

We’ve used Watermark Marine in Laconia (ask for Coby) and also Douglas Marine in Alton.

Both are good and generally responsive if you call vs email - though I know Watermark is very busy at present with Fall dock removals, etc.
Asloren1 is offline   Reply With Quote
The Following User Says Thank You to Asloren1 For This Useful Post:
Winilyme (10-15-2025)
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 07:00 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.15609 seconds