We have a cottage in Meredith with a crawl space that is less than usable because of dampness. We have been thinking about having it jacked up about 5 or 6 feet to make the front of the house more level with the street and to level and cement the floor to make the basement usable.
There is a concrete foundation in place now and I'm thinking that a concrete block wall in the front part of the house and a framed knee wall to the existing foundation under the rest of the house. Anybody out there have any experience with this type of project who may be able to provide some guidence and some do's and don't's? |
![]() |
![]() |
![]() |
#2 | |
Senior Member
Join Date: Apr 2007
Location: Maynard, MA & Paugus Bay
Posts: 2,570
Thanks: 753
Thanked 353 Times in 265 Posts
|
![]() Quote:
I recived a price to have someone put a 4 foot crawl space basement in a cottage in Laconia and price was just $35,000 doing it the right way (18x22 structure). I have a water table under my place of less than 6 feet. we are right on the water, the killer was the hoisting of the cottag up 5 feet and having it sit there on metal pilings while all the work was done underneath it. Plus it was a couple of weeks of work. NOt to mentiont he interior wall damage and ceiling damage that could come of it do to the stress, and my is just sits on blocks and pilings for now. I was basically told it would cost half as much as if I were to just tear down and start from scratch without out incurring hte cost of hoisting what is already there. Good Luck
__________________
Capt. of the "No Worries" |
|
![]() |
![]() |
![]() |
#3 |
Senior Member
Join Date: Jan 2005
Posts: 2,117
Thanks: 1,325
Thanked 559 Times in 288 Posts
|
![]()
Rolie:
I dealt with Bumble Bee Maintenance in Moultonboro last year for some sill work. They jacked up my house and replaced the sill. I am pretty sure they would be able to handle your project. Call Ray at 651-3255 for a quote. |
![]() |
![]() |
![]() |
#4 |
Senior Member
Join Date: Jan 2005
Posts: 64
Thanks: 0
Thanked 2 Times in 2 Posts
|
![]()
If you decide to not tackle this job and hand over to a pro, give Larry and Rich a call (603-524-5357) at Trademen Builders. They just completed a tear down and rebuild for me in Meredith and I'm certain they would be able to handle this.
|
![]() |
![]() |
![]() |
#5 |
Senior Member
Join Date: Apr 2004
Posts: 57
Thanks: 4
Thanked 7 Times in 4 Posts
|
![]()
I don't plan to do it myself. Does anybody have any experience with this kind of project that could give me an idea of what I'm in for? What permits are involved? Cost? "Other HIDDEN" costs?
|
![]() |
![]() |
Sponsored Links |
|
![]() |
#6 | |
Senior Member
Join Date: Jan 2005
Location: Florida (Sebring & Keys), Wolfeboro
Posts: 5,937
Thanks: 2,205
Thanked 776 Times in 553 Posts
|
![]() Quote:
I gave it some thought for myself, but I have an acre here, so I would be building—in effect—a tear-down. ![]() For dampness, you may want to look upslope to see if the problem arises there. Water can find its way under most structures and driveways: if your subsoil is clay, water has nowhere to go. But water will find a way!
__________________
Is it ![]() ![]() |
|
![]() |
![]() |
![]() |
#7 |
Senior Member
Join Date: Apr 2004
Posts: 57
Thanks: 4
Thanked 7 Times in 4 Posts
|
![]()
Does anybody have any experience with 3-G Construction, I think in Holderness?
|
![]() |
![]() |
![]() |
#8 |
Senior Member
Join Date: Aug 2007
Posts: 446
Thanks: 70
Thanked 57 Times in 40 Posts
|
![]()
Bernard Pineo and his son Jimmy both have construction business in Wolfeboro. I have had both do work and would not hire either again. There are far better choices.
|
![]() |
![]() |
![]() |
#9 |
Senior Member
Join Date: May 2006
Location: Texas, Lake Ray Hubbard and NH, Long Island Winnipesaukee
Posts: 2,867
Thanks: 1,036
Thanked 892 Times in 524 Posts
|
![]()
Rollie,
Before taking on a project on like this besides getting some recomendations of contractors I suggest taking in 4 to 5 quotes if you are unfamiliar with what needs to be done. Not really know your situation it is hard to give any recomendations. But if you have a few guys out to give you bids you will start to see simularities and and differences in what they want to do. And then you start question those differences and you will learn a lot in the process. And above all else before contracting someone to do the work get every last detail in writing. As for what permits will be required take a trip to town hall and have a conversation with the building inspector........
__________________
Life is about how much time you can spend relaxing... I do it on an island that isn't really an island..... |
![]() |
![]() |
![]() |
#10 |
Senior Member
Join Date: Apr 2004
Posts: 57
Thanks: 4
Thanked 7 Times in 4 Posts
|
![]()
.....Thanks....all great suggestions. I have contacted 1 contractor and will see what he has to say about the project itself and required permits. Then I can compare what he says with what the bldg inspector says. I like to ask questions the answer to which I already know. That can help to quickly weed out those who don't know what they're talking about.
I plan to get 3 or 4 estimates before I make a go/no go decision. Thanks again |
![]() |
![]() |
![]() |
#11 |
Senior Member
Join Date: Apr 2004
Posts: 57
Thanks: 4
Thanked 7 Times in 4 Posts
|
![]()
Hi again,
Anybody have any experience and/or comments about 3-G Construction in Holderness or Interlakes Builders in Meredith? |
![]() |
![]() |
![]() |
#12 |
Senior Member
|
![]()
My parents did this exact project to their lake house back in the late 80's. I'm pretty sure that they used James Piscopo out of Belmont as the GC. Anyway the house was on piers and they had the house jacked up. They used hydraulics to lift it and then an excavator dug out under the house before they poured a concrete foundation.
Just like your situation the house was lower than the street. After the house was jacked up it was level with the street. This created a walk out basement. All in all I believe they were very satisfied with the results. Not sure if there were any "hidden costs." Just remember once you get into this project significant electrical, plumbing, heating, costs. My parents had an extra bathroom put in the basement. This required plumbing work prior to the concrete being poured. It is a good opportunity that you want to take advantage of. Even if you just have it roughed in and wait to finish it later. They put in a utility room with the heating and hot water tank in it and had that room plumbed for a washer drier. After re-reading your post you said "usable." Did you mean as a living space? I just assumed you did. If so carefully consider the plumbing issues I mentioned. You'll kick yourself later on if you decide to do add a bathroom/laundry room and your jackhammering the concrete floor. ![]() |
![]() |
![]() |
![]() |