Go Back   Winnipesaukee Forum > Winnipesaukee Forums > Getting Here
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQ Members List Donate Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 03-29-2020, 06:46 AM   #13
BroadHopper
Senior Member
 
BroadHopper's Avatar
 
Join Date: Oct 2004
Location: Laconia NH
Posts: 5,617
Thanks: 3,247
Thanked 1,115 Times in 801 Posts
Default Two projects planned on 104

On the side where the Mobil Station stands, between the station and I-93, a medical park is scheduled to be built there.
On the side where the park and ride is located, between the park and ride and I-93, is where Rusty and Al is putting in a rest area similar to the Hooksett area minus the liquor store. The brown building will be preserved and moved to a different location.
Like NH.Solar says, New Hampton should form a committee now, to study future traffic in the area. You don't want a mess you see in Tilton!
__________________
Someday may never be an actual day.
BroadHopper is offline   Reply With Quote
The Following 2 Users Say Thank You to BroadHopper For This Useful Post:
Loub52 (03-29-2020), MBNeckguy (04-03-2020)
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 08:20 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 1.90566 seconds