Go Back   Winnipesaukee Forum > Winnipesaukee Forums > Restaurant Information & Reviews
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQ Members List Donate Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 08-10-2025, 10:37 AM   #1
Swimmer215
Junior Member
 
Join Date: Feb 2024
Posts: 17
Thanks: 1
Thanked 3 Times in 3 Posts
Default Fifty-five Main in Meredith

Former location of our beloved Waukewan Antiques and the Phu Jee restaurant. We snoop around the construction site every time we're over there. The renderings of the future facade of the building look very cute, but the site seems to need an insane amount of work. They've completely gutted the building, basement and foundation, but oddly have left a very rickety-looking staircase in place (?). I'm wondering when they expect to be finished, and also how the owner(s) will recoup what looks like an astronomical investment -- especially since it looks like, at best, they won't open till after Thanksgiving. Anyone know anything?
Swimmer215 is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 02:31 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.86182 seconds