![]() |
![]() |
|
|||||||
| Home | Forums | Gallery | Webcams | Blogs | YouTube Channel | Classifieds | Register | FAQ | Members List | Donate | Today's Posts | Search |
![]() |
|
|
Thread Tools | Display Modes |
|
|
#1 |
|
Junior Member
Join Date: Feb 2024
Posts: 17
Thanks: 1
Thanked 3 Times in 3 Posts
|
Former location of our beloved Waukewan Antiques and the Phu Jee restaurant. We snoop around the construction site every time we're over there. The renderings of the future facade of the building look very cute, but the site seems to need an insane amount of work. They've completely gutted the building, basement and foundation, but oddly have left a very rickety-looking staircase in place (?). I'm wondering when they expect to be finished, and also how the owner(s) will recoup what looks like an astronomical investment -- especially since it looks like, at best, they won't open till after Thanksgiving. Anyone know anything?
|
|
|
|
|
|
#2 |
|
Senior Member
Join Date: Aug 2015
Posts: 930
Thanks: 297
Thanked 299 Times in 185 Posts
|
Sometimes old things are left as is during a remodeling process as it wouldn't meet today's building codes if altered or move.
Grandfather protection is always something to consider during any remodeling to take advantage of things you can no longer do (i.e. thinking of structures to close to a lot line, setbacks, etc.). |
|
|
|
|
|
#3 |
|
Senior Member
Join Date: Jun 2021
Posts: 3,568
Thanks: 3
Thanked 637 Times in 524 Posts
|
Commercial building.
So the staircase may be the temp used to access the second floor while construction is occurring. |
|
|
|
|
|
#4 | |
|
Junior Member
Join Date: Feb 2024
Posts: 17
Thanks: 1
Thanked 3 Times in 3 Posts
|
Quote:
|
|
|
|
|
|
|
#5 |
|
Senior Member
Join Date: Aug 2015
Posts: 930
Thanks: 297
Thanked 299 Times in 185 Posts
|
|
|
|
|
| Sponsored Links |
|
|
|
|
#6 |
|
Senior Member
Join Date: Jun 2016
Location: Tuftonboro and Sudbury, MA
Posts: 2,473
Thanks: 1,360
Thanked 1,050 Times in 652 Posts
|
The new owners are VERY well-heeled with plenty of relevant experience/connections. The expense will not phase them. This place will likely be great
|
|
|
|
|
|
#7 |
|
Senior Member
Join Date: Nov 2016
Location: Waltham Ma./Meredith NH
Posts: 4,269
Thanks: 2,316
Thanked 1,230 Times in 788 Posts
|
|
|
|
|
|
|
#8 |
|
Senior Member
Join Date: Jun 2021
Posts: 3,568
Thanks: 3
Thanked 637 Times in 524 Posts
|
It is going to get much worse.
|
|
|
|
|
|
#9 |
|
Senior Member
Join Date: Apr 2007
Location: Maynard, MA & Paugus Bay
Posts: 2,588
Thanks: 756
Thanked 358 Times in 269 Posts
|
Does anyone know what is going in there once done?
__________________
Capt. of the "No Worries" |
|
|
|
|
|
#10 |
|
Junior Member
Join Date: Feb 2024
Posts: 17
Thanks: 1
Thanked 3 Times in 3 Posts
|
|
|
|
|
|
|
#11 |
|
Senior Member
|
Fifty-Five Main Kitchen & Bar ...... http://www.facebook.com/p/55-Main-St...1559987559560/ ...... total reconstruction and new construction addition in the back is happening here, right now. Is a big huge total renovation and addition in the back, build-out.
__________________
.... Banned for life from local thrift store!
|
|
|
|
![]() |
| Bookmarks |
|
|