As noted most town roads are old roadbeds that had some gravel added and then paved. The underlying drainage issues were not addressed hence water gets under, freezes and we get the frost heaves. The solution is not simple repaving but complete reconstruction down to frost line addressing drainage issues. As the cost for complete reconstruction can approach $1 million per mile, a town with 30 or 40 miles of paved roads can take this on only over a long period of time.
With frost what goes up comes back down so by MC week, things will be better. In the mean time, speeding is kept to a minimum.
Slickcraft is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 07:47 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 2.65739 seconds