Go Back   Winnipesaukee Forum > Winnipesaukee Forums > Getting Here
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQ Members List Donate Today's Posts

Reply
 
Thread Tools Display Modes
Old 10-03-2011, 07:38 AM   #1
Belmont Resident
Senior Member
 
Belmont Resident's Avatar
 
Join Date: Apr 2004
Location: Belmont NH but prefer Jackman Maine
Posts: 1,857
Thanks: 491
Thanked 410 Times in 251 Posts
Default test run

From what I understand the Hampton tolls were a test run to see if they worked before adding new ones.
I’ve heard that the Hooksett tolls are next.
Maybe after that they will get rid of the useless Bedford tolls and move them to Nashua.
Belmont Resident is offline   Reply With Quote
Old 10-03-2011, 01:15 PM   #2
Merrymeeting
Senior Member
 
Merrymeeting's Avatar
 
Join Date: Mar 2003
Location: Merrymeeting Lake, New Durham
Posts: 2,228
Thanks: 305
Thanked 801 Times in 369 Posts
Default

Quote:
Originally Posted by Belmont Resident View Post
From what I understand the Hampton tolls were a test run to see if they worked before adding new ones.
I’ve heard that the Hooksett tolls are next.
Maybe after that they will get rid of the useless Bedford tolls and move them to Nashua.
That's kind of my point. If they were thinking they might change it in the future, why did they just finish redoing it?
Merrymeeting is offline   Reply With Quote
Old 10-03-2011, 06:37 PM   #3
Belmont Resident
Senior Member
 
Belmont Resident's Avatar
 
Join Date: Apr 2004
Location: Belmont NH but prefer Jackman Maine
Posts: 1,857
Thanks: 491
Thanked 410 Times in 251 Posts
Default because

That would make sense, and we all know that state workers never or hardly ever do things that make sense. I believe they call it job security. Makes no sense to me
Belmont Resident is offline   Reply With Quote
Old 10-04-2011, 11:33 AM   #4
mcdude
Senior Member
 
mcdude's Avatar
 
Join Date: Jul 2002
Location: Rock Haven Lake - West Newfield, ME
Posts: 5,367
Thanks: 374
Thanked 1,057 Times in 495 Posts
Default

click for; SPAULDING TURNPIKE TRAFIC CAMS

Quote:
WIDENING THROUGH ROCHESTER: In February 2008, the NHDOT began a $177 million project to widen 5.2 miles of the Spaulding Turnpike from EXIT 12 (NH 125) north to EXIT 16 (US 202 / NH 11). The work will widen the original two-lane "super-2" design to a full four-lane, dual-carriageway freeway shared by the rest of the turnpike to the south. Several bridges also will be built, including the bridge over NH 125 at EXIT 12 that has been flagged for replacement since 1992 because of structural deficiencies. The project is slated for completion in late 2012, approximately six years behind the original schedule.

THE TURNPIKE TODAY: According to the NHDOT, the Spaulding Turnpike carries 15,000 vehicles per day (AADT) along its two-lane northerly stretches to as many as 75,000 vehicles per day near the southern terminus in Portsmouth. The turnpike, which has been designated NH 16 along its entire length since 1991, joined the EZ-Pass system in 2005 when readers were added to the Dover and Rochester mainline toll plazas.

WHAT HAPPENED TO EXIT 10? The "missing" interchange was set aside for an east-west turnpike that was to extend west to the eastern terminus of I-393 near Concord. The NHDOT purchased right-of-way for the proposed EXIT 10 for $3 million in 1995, but the completion of the NH 101 Expressway likely precluded the need for the proposed link.
Project Specific Information

__________________


Last edited by mcdude; 10-05-2011 at 10:15 AM.
mcdude is offline   Reply With Quote
The Following User Says Thank You to mcdude For This Useful Post:
Ridgefarmer63 (10-05-2011)
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 10:11 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.17579 seconds