Go Back   Winnipesaukee Forum > Winnipesaukee Forums > General Discussion
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQ Members List Donate Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 05-09-2012, 05:30 PM   #12
Gatto Nero
Senior Member
 
Gatto Nero's Avatar
 
Join Date: May 2005
Location: Isola Gatto Nero
Posts: 697
Thanks: 162
Thanked 263 Times in 81 Posts
Default Impervious Surface question

Shorethings,

I apologize in advance if I'm being a pain, but I'll ask anyway in hopes that you'll continue to indulge me..

1) Does replacing all or part of standard asphalt paved driveway with pervious asphalt or pervious pavers count towards making a lot more nearly conforming? If so, does none of that newly paved driveway count against me with regard to the overall impervious surface measurement?

2) I understand from reading the Home Owners Guide to Starmwater Management, that if the lot is more than 30% impervious I need to have a certified engineer design a stormwater management system prior to obtaining a permit. If, after construction and by means such as above, the overall impervious surface is less than it is currently is it still necessary to hire the engineer to create the plan, or is a plan even necessary at that point?

Thanks again for your help.
__________________
La vita è buona su Isola Gatto Nero
Gatto Nero is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 03:35 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.

This page was generated in 0.14576 seconds