Go Back   Winnipesaukee Forum > Lake Issues > General Issues
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQDonate Members List Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 08-07-2012, 04:20 PM   #11
NoBozo
Senior Member
 
Join Date: Jun 2008
Location: Portsmouth. RI
Posts: 2,231
Thanks: 400
Thanked 460 Times in 308 Posts
Default

Windturbines are great when they work. The BIG ones are very difficult to maintain because they are way up there on a tower. We have a Three Year Old ($3M) town owned 1.5 MW turbine. The nacelle is 188 feet above ground. Two months ago the gear box failed.

To fix it, the rotor disc has to be taken down, then the nacelle. The crane cost is about $10,000 a day+ set up costs, because it's a special crane for big heights and weights. The quickest way to fix it is to replace the large gearbox (30,000 pounds) with the nacelle on the ground. The gear box is rumored to cost +/- $450,000.

The Canadian company that built it went bankrupt two years ago..the 10 year warranty went "PooF". The town has no Spare Change so the turbine sits there doing nothing. It WAS a sight to see when it was running.

There is No Free Lunch NB
NoBozo is offline  
The Following User Says Thank You to NoBozo For This Useful Post:
bclaker (08-08-2012)
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 10:11 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.36267 seconds