Go Back   Winnipesaukee Forum > Winnipesaukee Forums > General Discussion
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQDonate Members List Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 04-17-2013, 12:16 PM   #16
PaugusBayFireFighter
Senior Member
 
Join Date: Sep 2012
Posts: 837
Thanks: 361
Thanked 674 Times in 264 Posts
Default

The majority of construction is interior demolition and rebuilding of the existing stores in the mall. They are expanding more than building. You could do construction all summer in the vacant stores and never be close to the current Walmart. My guess is the construction that involves the existing store would be toward the end of the project.
PaugusBayFireFighter is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 05:52 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.70654 seconds