![]() |
![]() |
|
Home | Forums | Gallery | Webcams | Blogs | YouTube Channel | Classifieds | Calendar | Register | FAQ | Donate | Members List | Today's Posts | Search |
![]() |
|
Thread Tools | Display Modes |
|
![]() |
#1 |
Senior Member
Join Date: Feb 2008
Location: Gilford, NH / Welch Island
Posts: 6,250
Thanks: 2,391
Thanked 5,283 Times in 2,055 Posts
|
![]()
Also, sometimes the drain holes are on the top of the tube under the deck and a pump with tubing is required to drain the logs.
Bennington Pontoons do not have drain holes and are not pressurized. If you get hole on the upper portion of the tube Bennington recommends drilling a hole in the bottom of the affected baffles and having a competent welder re-weld. Dan |
![]() |
![]() |
![]() |
Bookmarks |
|
|