Go Back   Winnipesaukee Forum > Winnipesaukee Forums > Boating
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQ Members List Donate Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 05-17-2013, 09:54 AM   #12
Happy Gourmand
Senior Member
 
Happy Gourmand's Avatar
 
Join Date: Jul 2008
Location: Ruskin FL
Posts: 1,027
Thanks: 188
Thanked 322 Times in 179 Posts
Default

Quote:
Originally Posted by AC2717 View Post
agree there should be a rush status or a top the top of the pile type thing for something like this, especially on existing structure
And then should the same "special provisions" be available to Mr. John Q Public who just wants to repair damage done to his dock as long as there are no enhancements/expansion that are not outside the intent or provisions of the original approval?
I think the laws and regulations should apply equally to all. The gubmint makes the rules, they should also abide by them.
Happy Gourmand is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 10:22 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.17299 seconds