Go Back   Winnipesaukee Forum > Winnipesaukee Forums > General Discussion
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQDonate Members List Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 11-21-2015, 07:12 AM   #28
fatlazyless
Senior Member
 
fatlazyless's Avatar
 
Join Date: Apr 2004
Posts: 8,787
Blog Entries: 1
Thanks: 300
Thanked 1,022 Times in 744 Posts
Default

According to the article in yesterday's CITIZEN, any Laconia structure or building more than 50-years old seeking a demolition permit needs to be reviewed by the Laconia Heritage Commission. Saint Helena's Church was supposedly constructed in 1955, but was listed as 1982 on its Building Dept info card, an error, which led to Laconia issuing a demolition permit without Heritage Commission review.

Oh well, a church is all about the people, and the Saint Helena's church building was particularly unattractive, and judging by the front exterior photo looks el cheapo construction, surrounded by a totally black asphalt parking lot with no trees or landscaping, so it is goodbye old church building, and hello new residential development.
.......

"I did everything I could to save the church," ....quote from the developer in today's CITIZEN in a second follow up article. " But I fixed the problem with it by putting the church in the dumpster."
__________________
... down and out, liv'n that Walmart side of the lake!

Last edited by fatlazyless; 11-21-2015 at 08:03 AM.
fatlazyless is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 01:00 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.94473 seconds