Go Back   Winnipesaukee Forum > Winnipesaukee Forums > Home, Cottage or Land Maintenance
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQ Members List Donate Today's Posts

Reply
 
Thread Tools Display Modes
Old 06-06-2017, 08:48 PM   #1
SAB1
Senior Member
 
Join Date: Feb 2012
Location: Tuftonboro
Posts: 1,251
Thanks: 193
Thanked 334 Times in 242 Posts
Default

Last year we built a new home. The deck is 14x16 an it came in at 6,800 I believe
SAB1 is offline   Reply With Quote
Old 06-06-2017, 11:01 PM   #2
Descant
Senior Member
 
Join Date: Mar 2006
Location: Merrimack and Welch Island
Posts: 4,451
Thanks: 1,373
Thanked 1,650 Times in 1,078 Posts
Default Material?

Quote:
Originally Posted by SAB1 View Post
Last year we built a new home. The deck is 14x16 an it came in at 6,800 I believe
$6800 for TREX or PT?
Descant is offline   Reply With Quote
Old 06-07-2017, 07:35 AM   #3
Biggd
Senior Member
 
Join Date: Nov 2016
Location: Waltham Ma./Meredith NH
Posts: 4,227
Thanks: 2,290
Thanked 1,224 Times in 782 Posts
Default

Quote:
Originally Posted by SAB1 View Post
Last year we built a new home. The deck is 14x16 an it came in at 6,800 I believe
That doesn't sound right. That's about what it would cost just for materials if you include the PT framing and the Sona tube footings. My son built one about the same size 2 years ago using Azek. Just the materials were more than that and he got a contractors discount at Harvey's.

Last edited by Biggd; 06-07-2017 at 08:15 AM.
Biggd is online now   Reply With Quote
Old 06-07-2017, 09:02 AM   #4
SAB1
Senior Member
 
Join Date: Feb 2012
Location: Tuftonboro
Posts: 1,251
Thanks: 193
Thanked 334 Times in 242 Posts
Default

Just checked my file. Materials alone were $6,078 for the Azek and framing under the deck, railings and three 3 stairs off the corner.
SAB1 is offline   Reply With Quote
Old 06-07-2017, 10:06 AM   #5
Biggd
Senior Member
 
Join Date: Nov 2016
Location: Waltham Ma./Meredith NH
Posts: 4,227
Thanks: 2,290
Thanked 1,224 Times in 782 Posts
Default

Quote:
Originally Posted by SAB1 View Post
Just checked my file. Materials alone were $6,078 for the Azek and framing under the deck, railings and three 3 stairs off the corner.
That's sounds more like it. My son went over and above what was require by the building code plus he use the fastening system they sell for securing the boards without seeing the screws which adds hundreds of $$$ more to the bill. Most builders will be 50/50 materials/labor. He got a price from a contractor of $13,500 and I doubt that they would have done a nicer job than he did himself with help of a carpenter friend. I think he paid his friend 3K so it still cost him about 10K but it came out beautiful.
Biggd is online now   Reply With Quote
Sponsored Links
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 12:56 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.12067 seconds