Go Back   Winnipesaukee Forum > Winnipesaukee Forums > General Discussion
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQ Members List Donate Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 09-19-2017, 09:35 AM   #5
TiltonBB
Senior Member
 
Join Date: Feb 2005
Location: Gilford, NH and Florida
Posts: 3,059
Thanks: 726
Thanked 2,235 Times in 955 Posts
Default

When Meredith Bay (or whatever name it went by back then, Akwa Vista?) was going to be built it was determined that there was not enough capacity and water pressure to service the amount of development that they proposed. They built the tank but it is filled and serviced by Laconia Water Works. It was built to look nice in the neighborhood rather than just be a plain old water tank.

When the tank is almost full the incoming water shuts off and the water pressure is from gravity until the level is low enough to cause the pumps to refill the tank.
TiltonBB is offline   Reply With Quote
Sponsored Links
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 09:30 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.16180 seconds