Go Back   Winnipesaukee Forum > Winnipesaukee Forums > General Discussion
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQDonate Members List Today's Posts

Reply
 
Thread Tools Display Modes
Old 04-28-2020, 12:08 PM   #1
VitaBene
Senior Member
 
VitaBene's Avatar
 
Join Date: Jul 2007
Location: Moultonborough
Posts: 3,597
Thanks: 1,642
Thanked 1,642 Times in 845 Posts
Default

Quote:
Originally Posted by Biggd View Post
Laconia is always looking for the cheap way out. The Weirs town docks will never get rebuilt.
I think their cost benefit analysis does not pay off for them to rework the docks. As boaters, we understand the issues with the Weirs town docks but I don't think they can sell it. Maybe they figure that they are busy enough in summer?

The overall issues with the Weirs are more evident off season- I think those are the ones they need to solve.
VitaBene is offline   Reply With Quote
The Following User Says Thank You to VitaBene For This Useful Post:
JEEPONLY (04-28-2020)
Old 04-28-2020, 01:18 PM   #2
Woodsy
Senior Member
 
Join Date: May 2004
Location: Weirs Beach
Posts: 1,968
Thanks: 80
Thanked 980 Times in 440 Posts
Default

I am very happy the Dive found a home here in the Weirs! They will be a welcome addition/attraction to the area!

Congrats to them!


Woodsy
__________________
The only way to eliminate ignorant behavior is through education. You can't fix stupid.
Woodsy is offline   Reply With Quote
The Following User Says Thank You to Woodsy For This Useful Post:
Capitan (05-07-2020)
Old 04-28-2020, 01:38 PM   #3
FlyingScot
Senior Member
 
Join Date: Jun 2016
Location: Tuftonboro and Sudbury, MA
Posts: 2,419
Thanks: 1,323
Thanked 1,030 Times in 638 Posts
Default

I don't understand how they are able to increase dock space. But as a separate matter--this may be the best resolution for all. Once The Dive is ensconced dockside, why would they want to motor elsewhere?
FlyingScot is offline   Reply With Quote
Old 04-28-2020, 02:23 PM   #4
Descant
Senior Member
 
Join Date: Mar 2006
Location: Merrimack and Welch Island
Posts: 4,414
Thanks: 1,366
Thanked 1,636 Times in 1,068 Posts
Default New business model?

This may be the start of a new/revised business model.
1. When will assembly restrictions be lifted for restaurants and bars?
2. What's the timeline for the new dock being in operation
3. Will they still operate out of the Pier until then?
Descant is offline   Reply With Quote
Old 04-28-2020, 03:38 PM   #5
Hillcountry
Senior Member
 
Hillcountry's Avatar
 
Join Date: Apr 2016
Location: In the hills
Posts: 2,420
Thanks: 1,677
Thanked 786 Times in 466 Posts
Default

Quote:
Originally Posted by FlyingScot View Post
I don't understand how they are able to increase dock space. But as a separate matter--this may be the best resolution for all. Once The Dive is ensconced dockside, why would they want to motor elsewhere?
I think their whole “deal” (business model) was sandbar entertainment.
And weather permitting, it should stay that way.
Hillcountry is offline   Reply With Quote
Sponsored Links
Old 04-28-2020, 03:56 PM   #6
FlyingScot
Senior Member
 
Join Date: Jun 2016
Location: Tuftonboro and Sudbury, MA
Posts: 2,419
Thanks: 1,323
Thanked 1,030 Times in 638 Posts
Default

Quote:
Originally Posted by Hillcountry View Post
I think their whole “deal” (business model) was sandbar entertainment.
And weather permitting, it should stay that way.
Sandbars was the original thought. The "should" I leave to them. But when they do the math, they might ask themselves each morning why they would invest the time and fuel necessary to motor to a place that is likely less populated than their dock. I guess we'll know in mid July
FlyingScot is offline   Reply With Quote
The Following User Says Thank You to FlyingScot For This Useful Post:
Hillcountry (04-28-2020)
Old 04-29-2020, 09:52 PM   #7
Descant
Senior Member
 
Join Date: Mar 2006
Location: Merrimack and Welch Island
Posts: 4,414
Thanks: 1,366
Thanked 1,636 Times in 1,068 Posts
Default Business hours?

Granted it was a long time ago,. but when I worked at the Weirs, things were pretty quiet on weekdays until 5:00-7:00 pm. If you can generate cash flow during the day, that's a better plan. It appears to me that there are a number of pposters speculating on the Dive's operations who have just not thoght itn through. The owners, on the other hand, have probably had their business plan scrutinized by professionals at several levels (bankers, investors, cpa's etc). If most restaurants fail in therir first 24 months and the Dive is in a position to invest $100,000 in docking, then it seems to me they have a better idea of what's going on than the naysayers on this Forum.
Descant is offline   Reply With Quote
Old 04-30-2020, 08:58 AM   #8
mhtranger
Senior Member
 
Join Date: Feb 2012
Posts: 130
Thanks: 321
Thanked 69 Times in 40 Posts
Default

Now I don’t have a dog in this fight as I don’t live up there full time or have never been on the Dive, but why does it sound like if this is approved that it will be built this season? Don’t people that live on the water have a heck of a time getting permits to rebuild their docks after the winter? Never mind trying to add on or just build a new dock.
I just hope it works out for all parties involved so it can bring some more money to the Weirs.
mhtranger is offline   Reply With Quote
Old 04-30-2020, 10:10 AM   #9
codeman671
Senior Member
 
codeman671's Avatar
 
Join Date: Jan 2005
Posts: 3,514
Thanks: 221
Thanked 821 Times in 493 Posts
Default

Quote:
Originally Posted by mhtranger View Post
Now I don’t have a dog in this fight as I don’t live up there full time or have never been on the Dive, but why does it sound like if this is approved that it will be built this season? Don’t people that live on the water have a heck of a time getting permits to rebuild their docks after the winter? Never mind trying to add on or just build a new dock.
I just hope it works out for all parties involved so it can bring some more money to the Weirs.
It can take up to 75 days for permit approval, should the application be correct, complete and conforms to the law the first time around. This would not be a small task to redo all of the docks.

What is their plan for this season for operation?
codeman671 is online now   Reply With Quote
Old 05-07-2020, 09:32 PM   #10
Capitan
Junior Member
 
Join Date: Apr 2020
Posts: 1
Thanks: 1
Thanked 4 Times in 1 Post
Default The Dive will build a new dock

The proposed dock is to extend the existing dock as stage 1, the second stage is to work with city of Laconia, by way of fundraising. The new plan proposed is to remove every other finger pier, and extend the one's left by 40'. This design will, in fact, decrease the overall dock size which is favorable with the DES and increase boat space by double, which was intended when originally built. They are investing in the city and the Weirs and only going to increase business, and bring new business to the weirs which would not normally be there. Why would any reasonable person complain, unless you are just a curmudgeon.
Capitan is offline   Reply With Quote
The Following 4 Users Say Thank You to Capitan For This Useful Post:
Descant (05-08-2020), gravy boat (05-08-2020), joey2665 (05-07-2020), mhtranger (05-08-2020)
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 12:48 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.25542 seconds