![]() |
![]() |
|
|||||||
| Home | Forums | Gallery | Webcams | Blogs | YouTube Channel | Classifieds | Register | FAQ | Members List | Donate | Today's Posts | Search |
|
|
Thread Tools | Display Modes |
|
|
#25 |
|
Senior Member
Join Date: Mar 2008
Location: Welch Island and The Taylor Community
Posts: 3,349
Thanks: 1,251
Thanked 2,121 Times in 970 Posts
|
CC was on island today. The 25 pair cable was replaced from behind #54 to the entry point between #58 and #59. We now have hardwired DSL replacing the spliced temp fix. The old cable is still on the ground.
The cable on Descant's branch is still down as there is an ongoing septic install at #60. Alan |
|
|
|
| The Following User Says Thank You to Slickcraft For This Useful Post: | ||
Descant (05-23-2023) | ||
| Bookmarks |
|
|