But fast can actually be slower because things need to be done twice or worse.

The correct protocol was for the load builder to contact the yard supervisor, the yard supervisor contacts the sales person, and the sales person calls the customer to adjust.

Like, you place an order for twenty 12' long double v-groove boards.
They are all good, but we only have ten. The sales person calls, if they didn't during the sales process, to determine whether you want just the ten... or if you wish to alter the order maybe taking some longer lengths.

Other things can go wrong, for instance.
I once had an outside sales person order a bunch of cedar with me.
I coded it wrong into the system, and ended up with Select Pine in the delivery.
When they asked if I had read it back to the sales person, I admitted that I had. But I did not read it as the coding... 16RCD... I stated over the phone 1x6 Cedar... and coded it into the system as 16C.
So I was at fault and not the sales person or the yard.
John Mercier is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 04:25 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.34114 seconds