Go Back   Winnipesaukee Forum > Winnipesaukee Forums > General Discussion
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQDonate Members List Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 06-11-2009, 03:44 PM   #11
krm
Member
 
Join Date: Apr 2007
Posts: 39
Thanks: 1
Thanked 0 Times in 0 Posts
Default quick math

There is no way it is worth the bill...
9 miles x 5280 LF x 12' wide = 570,240 SF / 9 =63,360 SY x .057 x 3" thick asphalt = 10,834 tons of asphalt @ $90/ton = $975,110 just for the asphalt and that is @ $90 per ton they will be very luck to get that price once this thing gets off the ground. The trail will have at least 9" of crush gravel =570,240 SF x (9/12) /27 = 15,840 CY (this price may very but on the cheap side lets say $18 in place) so 15,840 CY x $18 = $285,120. I could go all day if people are interested, on top of this 1.26mm you need to do cut/fill, treatment swales, bioretention cells, the list goes on...

Personally it sounds great but I don't feel like paying taxes for it
krm is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 02:26 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.33454 seconds