Go Back   Winnipesaukee Forum > Winnipesaukee Forums > General Discussion
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQ Members List Donate Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 10-29-2009, 03:13 PM   #16
Bizer
Senior Member
 
Bizer's Avatar
 
Join Date: Jul 2002
Location: Massachusetts
Posts: 337
Thanks: 0
Thanked 250 Times in 83 Posts
Default They've changed their mind.

The latest news is that the M/S Mount Washington will stay in the water for the winter. She will NOT be put into drydock. Here's an excerpt from an email I received:
Quote:
The ship will be heading into Center Harbor ( Weather permitting ) Saturday [31-Oct] after our Charter.. We are looking at the 4 o'clock departure from Weirs heading to Center Harbor. The boat will definitely not be pulled out of the water we are going to change the engines out on the starboard side. We are awaiting the bids form all the engine providers. As soon as we determine what engines are available and in stock at a price we like then we will move ahead with cutting the hole and taking out the engines. We are trying to make this event as public as possible. There are discussions of having the web cam moved to the top of the ship yard building looking down at the work platform. As well as doing regular press releases. As soon as precise dates start to come in regarding delivery of engines, gear boxes and installation, I will certainly pass it along. As of right now we are moving full steam ahead on upgrading to our tear 2 engine re-powering.
Bizer is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 04:12 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.24404 seconds