![]() |
![]() |
|
|||||||
| Home | Forums | Gallery | Webcams | Blogs | YouTube Channel | Classifieds | Register | FAQ | Members List | Donate | Today's Posts | Search |
|
|
Thread Tools | Display Modes |
|
|
#2 |
|
Senior Member
Join Date: Jan 2005
Posts: 3,604
Thanks: 223
Thanked 856 Times in 519 Posts
|
Mooring applications go pretty quick, you'd be surprised. Getting it off the dock would be the best solution. I have never been a fan of whips. If you have over 150 feet of frontage you could install a second dock finger and 4 way tie between the two.
A boat lift would be great, but it will cost you to purchase, plus annual install/remove charges (probably $400 each time they touch it). Depth is important with a lift such as a Sunstream. Typically you need 3-4' of water at the helm of the boat when parked at seasonal low water level for a cantilever lift to work. A Sunlift will probably run $8-10k easily. Sometimes used ones are available. |
|
|
|
| The Following User Says Thank You to codeman671 For This Useful Post: | ||
diprna (05-17-2012) | ||
| Bookmarks |
|
|