Go Back   Winnipesaukee Forum > Winnipesaukee Forums > General Discussion
Home Forums Gallery Webcams Blogs YouTube Channel Classifieds Register FAQDonate Members List Today's Posts

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 08-15-2017, 10:28 AM   #11
jetskier
Senior Member
 
jetskier's Avatar
 
Join Date: Apr 2004
Location: North Reading, MA and South Down Shores
Posts: 851
Thanks: 57
Thanked 183 Times in 114 Posts
Post Actually not

Quote:
Originally Posted by Paugus View Post
Jetskier, Thanks for the link but that grant number you provided (H33C22A000349) and all of the others listed on that usaspending.gov link are for Phase 1.
"Project Description
LACONIA; WOW TRAIL PH 1; CONSTRUCT 7040' (Segments 7-10) SHARED USE PATH IN RR CORRIDOR FROM MAIN ST TO ELM ST; [04-28TE]"

As I recall, Phase 1 was built in 2010, which makes sense given the dates of the federal grants your link mentions. I still can't find anything about a federal grant for Phase 2.
The grant was given during the Phase I period and covers both phases. The Phase I draw down was $61k which is in the WOW Org financials. The Phase II draw down was $500k (2015 financials). That is why I posted the 2015 financials.

Jetskier
jetskier is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -5. The time now is 08:28 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.

This page was generated in 0.27315 seconds